![Baoding Longer Precision Pump YZ Series Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/baoding-longer-precision-pump/yz-series/yz-series_user-manual_3737471004.webp)
PRODUCT MAINTENANCE
For optimum tubing life, keep tubing straight where it enters and exits
the pump.
Stop the drive when changing the tubing or its position in the rotor
mechanism (the rotor is partially exposed when the loading lever is in
the open position).
Keep the roller clean and dry in order to extend the using life of the
tube and rotor.
WARRANTY
The warranty period for this product is one year. If repair or adjust-
ment is necessary within the warranty period, the problem will be
corrected at no charge if it is not due to misuse or abuse on your part,
as determined by the manufacturer. Repair costs outside the war-
ranty period, or those resulting from product misuse or abuse, may
be invoiced to you.
PUMP HEAD INSTALLATION
The pump head is connected to driver unit by three m5 screws. Insert
the three screws into the mounting holes,
connect the pump head with
the driver unit end to end, then tighten the screws.
To connect two or more pump heads, longer screws are needed.
PROMPT:
Try your best to tighten the three screws in the same degree. Do not
over-tighten the screws to prevent the support block from deforming
and buzz.
LongerPump
TM
YZ Series
OCCLUSION ADJUSTMENT
Usually, the occlusion has been adjusted according to standard wall
thickness tubing.
If the wall thickness of tubing is not standard, you can adjust the
occlusion as follows: first load the tubing, and place the inlet of the
tubing into water. Then loose the locknut of the fine-tune assembly,
and turn the screw with an inner hexagon spanner, till there are ex-
actly no blebs when blowing from the outlet. At last, tighten the locknut.
If there are still blebs after turning the screw to end clockwise, it
suggests that the wall thickness of the tubing is too thin and beyond
the applicable range.
TUBE LOADING
Rotate lever to left to open pump head, load tubing.
Rotate lever to right to close pump head.
Tubing is retained automatically by tubing clamps.
YZ35,YZ35-13 pump head direction for use
Fine-Tune
Assembly
Mounting
Holes
Compression
Block
Lever
Tubing
Clamp
Base
Rotor
Support
Block
PUMP HEAD
APPLICABLE TUBING
TUBING WALL
THICKNESS
YZ35
73
#
82
#
3.5
0.3(mm)
LongerPump
TM
YZ Series
Fine-Tune
Assembly