6. Add 

Logic Blocks

 by clicking on 

one of the empty placeholders in the 

middle area:

• And

7.  For this con

fi

 guration, increase the 

number of 

Input Nodes

 to “

3

”.

8. Connect 

Optical Sensor

Gate 

Switch

, and 

Latch Reset Block

 to 

one of the input nodes on the 

AND

 

block.

9. Connect 

Emergency Stop

 and 

Manual Reset

 to the 

Latch Reset 

Block

.

10. Connect  the 

AND

 block to the 

Solid 

State Output

 (

SO1

).

Note:

 You may re-arrange any of the 

Equipment blocks or Functional Elements 

blocks for a better visual representation 

of the connections. Solid State Output 

blocks cannot be moved.

Содержание XS26-2 Series

Страница 1: ...r PC Interface For complete information on mounting device installation and operation commissioning checkout procedures product specifications troubleshooting and glossary please refer to the Safety C...

Страница 2: ...that are necessary to create a configuration for any application The example configuration is based on a sample application which makes use of the following devices an XS SC26 2 Safety Controller an E...

Страница 3: ...rom www bannerengineering com xs26 Important Administrative rights are required to install the Safety Controller drivers needed for communication with the controller To install the software from the B...

Страница 4: ...4 www bannerengineering com Tel 1 763 544 3164 P N 148770 Rev F Designing a Configuration Open XS26 2 Expandable Safety Controller from the Desktop or the Start Menu PC Interface Features...

Страница 5: ...equipment Functional View provides an editable iconic representation of the control logic Wiring Diagram displays the I O device wiring detail for use by the installer Ladder Logic displays a symboli...

Страница 6: ...thor Person designing the configuration Notes Supplemental information for this configuration or project Project Date Date pertaining to the project Add Equipment 1 On the Equipment view select your B...

Страница 7: ...der the Base Module Manual Reset Create Connections 4 Go to Functional View Note The Check List on the left lists any missing connections that need to be added before the configuration is valid 5 Add...

Страница 8: ...s to 3 8 Connect Optical Sensor Gate Switch and Latch Reset Block to one of the input nodes on the AND block 9 Connect Emergency Stop and Manual Reset to the Latch Reset Block 10 Connect the AND block...

Страница 9: ...anties All specifications published in this document are subject to change Banner reserves the right to modify product specifications or update documentation at any time Specifications and product inf...

Отзывы: