5. Observe the LED behavior to verify the devices are communicating with each other.
•
For housed models, the Gateway's LED 1 is solid green and the Node's LED 1 flashes green to indicate it is
communicating with the Gateway.
•
For board-level models, the Gateway's LED is solid green and the Node's LED flashes green to indicate it is
communicating with the Gateway.
6. Configure any I/O points to use the sensors connected to the Sure Cross devices.
7. Conduct a site survey between the Gateway and Nodes. If the site survey instructions are not included in this datasheet,
refer to the product manual for detailed site survey instructions.
8. Install your wireless sensor network components. If installation instructions are not included in this datasheet, refer to the
product manual for detailed installation instructions.
For additional information, including installation and setup, weatherproofing, device menu maps, troubleshooting, and a list of
accessories, refer to one of the following product manuals.
•
Sure Cross
®
•
Sure Cross
®
Wireless I/O Network Instruction Manual:
•
Web Configurator Instruction Manual (used with "Pro" and DX83 models):
•
Host Controller Systems Instruction Manual:
Configure the DIP Switches
Before changing DIP switch positions, disconnect the power. DIP switch changes are not recognized until after power is cycled to
the device.
For parameters not set via DIP switches, use the User Configuration Tool (UCT) to make configuration changes. For parameters set
using the DIP switches, the DIP switch positions override any changes made using the User Configuration Tool.
Accessing the Internal DIP Switches
To access the internal DIP switches, follow these steps:
1. Unscrew the four screws that mount the cover to the bottom housing.
2. Remove the cover from the housing without damaging the ribbon cable or the pins the cable plugs into.
3. Gently unplug the ribbon cable from the board mounted into the bottom housing.
4. Remove the black cover plate from the bottom of the device's cover.
The DIP switches are located behind the rotary dials.
After making the necessary changes to the DIP switches, place the black cover plate back into position
and gently push into place. Plug the ribbon cable in after verifying that the blocked hole lines up with
the missing pin. Mount the cover back onto the housing.
DIP Switch Settings
Switches
Device Settings
1
2
3
4
5
6 1
900 MHz transmit power level: 1 Watt (30 dBm)
OFF*
900 MHz transmit power level: 250 mW (24 dBm), DX80
compatibility mode
ON
Modbus or UCT configured (overrides DIP switches 3-8)
OFF*
DIP switch configured
ON
Inputs sourcing (PNP)
OFF*
Inputs sinking (NPN)
ON
Link loss output: zero
OFF*
OFF*
Link loss output: one
OFF
ON
Link loss output: hold last state
ON
OFF
Link loss output: user configuration
ON
ON
0 to 20 mA scale
OFF*
4 to 20 mA scale
ON
* Default configuration
1 Not used when configured for 0-10 V I/O.
Sure Cross
®
Performance P2-KR Gateway
2
www.bannerengineering.com - Tel: + 1 888 373 6767
P/N 182821 Rev. B