Banner Mini-Beam ac-Voltage Series Скачать руководство пользователя страница 4

P/N 69942 rev. A

Banner Engineering Corp., 9714 Tenth Ave. No., Minneapolis, MN 55441 • Phone: 763.544.3164 • www.bannerengineering.com • Email: [email protected]

Installation 

Guide

WARRANTY:  

Banner Engineering Corp. warrants its products to be free from defects for one year. 

Banner Engineering Corp. will repair or replace, free of charge, any product of its manufacture found to 

be defective at the time it is returned to the factory during the warranty period. This warranty does not 

cover damage or liability for the improper application of Banner products. This warranty is in lieu of any 

other warranty either expressed or implied.

MINI-BEAM

®

 ac-Voltage Series

Supply Voltage and Current

 

24 to 240V ac (50/60 Hz), 250V ac maximum

Supply Protection Circuitry

 

Protected against transient voltages

Output Configuration

 

SPST SCR solid-state relay with either normally closed or normally open contact (“light/

dark operate” selectable); 2-wire hookup

Output Rating

 

Minimum load current 5 mA; maximum steady-state load capability 300 mA to 50°C 

ambient (122°F) 100 mA to 70°C ambient (158°F)

Inrush capability:

 3 amps for 1 second (non repetitive); 10 amps for 1 cycle (non 

repetitive)

OFF-state leakage current:

 less than 1.7 mA rms

ON-state voltage drop:

 

 5 volts at 300 mA load, 

 10 volts at 15 mA load

Output Protection Circuitry

 

Protected against false pulse on power-up

Output Response Time

 

 

Opposed:

 2 millisecond on and 1 millisecond off; 

 

Non-Polarized and Polarized Retro, Convergent, and Plastic Fiber Optic:

 

  4 milliseconds on and off; 

 

Diffuse and Glass Fiber Optic: 

8 milliseconds on and off. 

OFF response time specification does not include load response of up to 1/2 ac cycle (8.3 

milliseconds). Response time specification of load should be considered when important. 

(NOTE: 300 millisecond delay on power-up.) 

Repeatability

 

 

Opposed:

 0.3 milliseconds;

 

  Non-Polarized and Polarized Retro, Convergent, and Plastic Fiber Optic:

 

  1.3 milliseconds; 

 

Diffuse and Glass Fiber Optic: 

2.6 milliseconds.

Response time and repeatability specifications are independent of signal strength. 

Adjustments

 

Light/Dark Operate Select switch, and 15-turn slotted brass screw Gain (sensitivity) 

adjustment potentiometer (clutched at both ends of travel). Both controls are located on the 

rear panel of the sensor and are protected by a gasketed, clear acrylic cover (see page 2).

Indicators 

Red indicator LED on rear of sensor is ON when the load is energized.

Construction 

Reinforced thermoplastic polyester housing, totally encapsulated, o-ring sealing, acrylic 

lenses, stainless steel screws

Environmental Rating

 

Meets NEMA standards 1, 2, 3, 3S, 4, 4X, 6, 12, and 13; IEC IP67. 

Connections

 

PVC-jacketed 2-conductor 2 m (6.5') or 9 m (30') cables, or 3-pin Micro-style QD fitting; 

QD cables available separately. 

Operating Conditions

 

 

Temperature:

 -20° to +70°C (-4° to +158°F) 

 

Maximum relative humidity:

 90% at 50°C (non-condensing)

Application Notes

 

•  Overload conditions can destroy ac MINI-BEAM sensors. Directly wiring sensor 

without load series, across hot and neutral will damage sensor (except emitter models).

• Low-voltage use requires careful analysis of the load to determine if the sensor’s    

  leakage current or on-state voltage will interfere with proper operation of the load.
•  The false-pulse protection feature may cause momentary drop-out of the load 

  when the sensor is wired in series or parallel with mechanical switch contacts.

Certifications

Additional information on this product is immediately available online at 

www.bannerengineering.com/69942

 

View or download additional information, including excess gain curves, beam patterns and accessories.  

For further assistance, contact a Banner Engineering Applications Engineer at (763) 544-3164 or (888) 373-6767.

1)  With supplied fiber cutter, make a clean cut at control ends of fibers. 
2)   Unlock the fiber gripper as shown below. Apply appropriate fiber adaptors 

prior to fiber insertion, if needed. 

3)  Gently insert the prepared fiber ends into the ports, as far as they will go.
4)  Slide the fiber gripper back to lock, as shown below.

Glass Fiber Installation

Plastic Fiber Installation

Fiber Installation

1)  Install the O-ring (supplied with the fiber) on each fiber end, as shown in the 

drawing.

2)  While pressing the fiber ends firmly into the ports on the sensor front, slide the 

U-shaped retaining clip (supplied with the sensor) into the slot in the 

sensor’s barrel, until it snaps into place.

Specifications

Trimmed fiber

control ends

Plastic fiber

emitter port

Plastic fiber

receiver port

Gripper

Unlock

Lock

Adapters for

0.25- and 0.5-mm fibers

Sensor Face

O-ring

Retaining  Clip

Отзывы: