banks Banks Split-Dual Monster F250 Скачать руководство пользователя страница 2

 
  Dear Customer,
  If you have any questions    

  concerning the installation of  

  your Banks Power System,    

  please call our Technical Service  

  Hotline at (888) 839-2700    

  between 7:00 am and 5:00 pm  

  (PT). If you have any questions  

  relating to shipping or billing,  

  please contact our Customer  

  Service Department at (888)   

  839-5600.
  Thank you.

1.

 Before starting work, familiarize 

yourself with the installation procedure 

by reading all of the instructions.

2.

 The exploded view (

Figure 1

, pages 

4-5) provides only general guidance. 

Refer to each step and section diagram 

in this manual for proper instruction.

3.

 Throughout this manual, the 

left side of the vehicle refers to the 

driver’s side, and the right side to  

the passenger’s side.

4.

 Disconnect the negative (ground) 

cable from the battery (or batteries, if 

there are two) before beginning work. 

5.

 Route and tie wires and hoses a 

minimum of 6” away from exhaust 

heat, moving parts, and sharp edges. 

clearance of 8” or more is recommended 

where possible.

6.

 When raising the vehicle, support  

it on properly weight-rated safety 

stands, ramps or a commercial hoist. 

Follow the manufacturer’s safety 

precautions. Take care to balance the 

vehicle to prevent it from slipping or 

falling. When using ramps, be sure the 

front wheels are centered squarely on 

the topsides. When  raising the front  

of the vehicle, put the transmission in 

park (automatic) or reverse (manual), 

set the parking brake, and block the 

rear wheels. When raising the back of 

the vehicle, be sure the vehicle is on 

level ground and the front wheels are 

blocked securely. 

Caution! Do not use floor jacks to 

support the vehicle while working 

under it. Do not raise the vehicle 

onto concrete blocks, masonry 

or any other item not intended 

specifically for this use.

7.

 During installation, keep the work 

area clean. Do not allow anything to 

be dropped into intake, exhaust, or 

lubrication system components while 

performing the installation, as foreign 

objects will cause immediate engine 

damage upon start-up.

General Installation Practices

2

   

96547 v.1.0

Содержание Banks Split-Dual Monster F250

Страница 1: ...el F250 F350 Trucks THIS MANUAL IS FOR USE WITH SYSTEM 49786 49787 Gale Banks Engineering 546 Duggan Avenue Azusa ca 91702 626 969 9600 Fax 626 334 1743 Product Information Sales 800 438 7693 Customer...

Страница 2: ...rp edges Clearance of 8 or more is recommended where possible 6 When raising the vehicle support it on properly weight rated safety stands ramps or a commercial hoist Follow the manufacturer s safety...

Страница 3: ...and 1 2 and 3 8 drive extension Inch and metric combination or open end wrenches Standard screwdriver Clean shop towels or rags Pry bar Reciprocating saw Highly recommended tools and supplies Foot pou...

Страница 4: ...aust Clamp 3 5 52468 3 7 Exhaust Clamp 4 52470 1 8 Hanger Clamp Intermediate 53986 1 9 Hanger Clamp Rear 53989 1 10 Frame Hanger Bracket 53566 1 11 Nylock Nuts 7 16 20 91617 2 12 Washers 7 16 91603 4...

Страница 5: ...16 15 4 6 3 14 11 12 10 13 5 6 9 96547 v 1 0 5...

Страница 6: ...ATE FILTER TUBING DURING THE REMOVAL PROCESS Separate the intermediate pipe to Diesel Particulate Filter connection Note the use of an oxy acetylene torch may be necessary Remove the intermediate pipe...

Страница 7: ...cutting length 2008 Ford Power Stroke 6 4L Wheel Base Cut this length from the Intermediate Pipe See Figure 2 Super Cab Short Bed 141 8 20 Crew Cab Short Bed 156 2 No Cut Crew Cab Long Bed 172 4 No C...

Страница 8: ...pipe outlet Install the driver side tailpipe hanger into the vehicle rubber insulator Position the rubber insulator as shown in Figure 5 14 Install the passenger side tailpipe onto the right Y pipe o...

Страница 9: ...S DRIVER SIDE TAILPIPE ZIP TIE ON VENT HOSE BRAKE LINE BANKS PASSENGER SIDE TAILPIPE ADJUST SO THAT SPARE TIRE TO HEAT SHIELD CLEARANCE IS WITHIN 1 2 MOVE SPARE TIRE TOWARDS REAR OF VEHICLE Figure 6 9...

Страница 10: ...pe tip Caution The protective covering may ignite and burn if not removed prior to running the engine 20 Re route any vent hose or brake lines away from the tailpipe using the supplied Cable ties 21 Y...

Страница 11: ...Figure 8 96547 v 1 0 11...

Страница 12: ...2008 Ford F 250 F 350 6 4L Power Stroke Banks Split Dual Monster Exhaust Quad Tip 12 96547 v 1 0...

Страница 13: ...Page Left Intentionally Blank 96547 v 1 0 13...

Страница 14: ...Template 1 For Right Side of undercarriage fender 14 96547 v 1 0...

Страница 15: ...Template 2 For Left Side of undercarriage fender 96547 v 1 0 15...

Страница 16: ...Gale Banks Engineering 546 Duggan Avenue Azusa ca 91702 626 969 9600 Fax 626 334 1743 Product Information Sales 800 438 7693 Customer Support 888 839 5600 bankspower com...

Отзывы: