background image

STRAIGHT AND FULL PIPE RECOMMENDATIONS

7

10x

It is recommended to have at least 20 inches of straight pipe before the flow meter and at least 20 inches after.

X = Diameter

ELECTRICAL CONNECTIONS, CABLE CONNECTIONS & OPERATION

10x

ELECTRICAL CONNECTIONS

A connector is provided on the outside of the flow meters. To connect to the meter, plug the cable in and hand tighten the retaining threads. Follow 

the diagram to make connections. If you are using the pulse output, connect power first and determine that the meter is working properly by 

observing the display, then connect the pulse output. 

CABLE CONNECTIONS

OPERATION - GROUNDING

For best performance, especially in noisy environments, the gray ground wire and the bare drain wire should be connected together and to a good 

earth ground as close to the meter as possible. Metal pipe and fittings in contact with the fluid, should also be bonded to the same earth ground with 

corrosion-resistant connections. 

Содержание MFM220

Страница 1: ...and total ow in usage monitoring applications These would include wells industrial wastewater leach mining discharge cooling tower deduct metering turf and landscape applications and other water recla...

Страница 2: ...o change the batteries yearly 4 The flow rate of the meter is designed to have an unlimited flow meaning that the meter will read as much flow as one can push though a 2 full port coupling However the...

Страница 3: ...Powder coated die cast aluminum electronics housing Corrosion resistant glass filled polypropylene body Lightweight for easy handling Clamping flanges for ease of installation FEATURES DIMENSIONS 6 4...

Страница 4: ...AA alkaline cells replaceable Life 1 year with meter in use 3 years dry 10 30 Vdc 60 mA max 15 mA average Note Using an unregulated power supply 18 Vdc may damage the meter due to AC line input volta...

Страница 5: ...me piping conditions require more than this See chart for recommendations If hose is used use smooth bore hose Follow the diagram below to make the connections INSTALLATION Step 1 Position gasket at e...

Страница 6: ...to others See the position diagram for guidance POSITION Recommended May prevent sediment or bubble problems Electrode moved from top by rotating meter Intermittent air bubbles miss electrode Electro...

Страница 7: ...ining threads Follow the diagram to make connections If you are using the pulse output connect power first and determine that the meter is working properly by observing the display then connect the pu...

Страница 8: ...the batteries should be changed Six alkaline AA cells are required To change the batteries first remove the four screws which hold the top cover in place Be careful not to lose the washers Move the t...

Страница 9: ...and total ow in usage monitoring applications These would include wells industrial wastewater leach mining discharge cooling tower deduct metering turf and landscape applications and other water recla...

Страница 10: ...o change the batteries yearly 4 The flow rate of the meter is designed to have an unlimited flow meaning that the meter will read as much flow as one can push though a 2 full port coupling However the...

Страница 11: ...ining threads Follow the diagram to make connections If you are using the pulse output connect power first and determine that the meter is working properly by observing the display then connect the pu...

Страница 12: ...AA alkaline cells replaceable Life 1 year with meter in use 3 years dry 10 30 Vdc 60 mA max 15 mA average Note Using an unregulated power supply 18 Vdc may damage the meter due to AC line input volta...

Страница 13: ...me piping conditions require more than this See chart for recommendations If hose is used use smooth bore hose Follow the diagram below to make the connections INSTALLATION Step 1 Position gasket at e...

Страница 14: ...Powder coated die cast aluminum electronics housing Corrosion resistant glass filled polypropylene body Lightweight for easy handling Clamping flanges for ease of installation FEATURES DIMENSIONS 6 4...

Страница 15: ...to others See the position diagram for guidance POSITION Recommended May prevent sediment or bubble problems Electrode moved from top by rotating meter Intermittent air bubbles miss electrode Electro...

Отзывы: