standard installation
(side mount)
preparation - no brackets, mounting on track
1
2
a. With the door closed, mark the
position of the top of the second
door wheel on the inside of the
track.
b. Place the drilling template
6
label with the Datum line on top
of the line marked inside.
c. Using an 6mm and 18mm
stepped drill, drill marked holes
through the guide and remove
any burs from holes.
d. Assemble the Autolock
1
to the
track using 2 x screws
2
,
lock bolt flush
with inside of
guide
lock bolt when
engaged with
10mm clearance
e. Close the door and check the
position of the lock to the wheel,
there should be a 10mm clearance.
f. Test the operation of the AutoLock
by pressing the lock/unlock
button to ensure the lock bolt fully
engages through the guide without
interference.
PROCEED TO CONNECTING
BASE STATION TO THE OPENER.
prior to installation
Preparation - setting the door limits
Ensure the door limits have been set on the opener,
prior to installing the Auto-lock. Refer to the opener
manual for instructions.
install batteries
a. Insert batteries
4
into drive unit.
b. Place cover back on drive unit
and secure with 4 x screws
3
.
4
3
WARNING! remove all manual locking
systems prior to installing lock. Any damage
as a result of a manual lock will void the
warranty for the door, Auto-lock and opener.
program lock
a. Press and hold the info button
i
on drive
unit until the light goes red.
b. Then press the lock/unlock button to test
the drive unit.
2
Auto-Lock Kit -
Installation instructions