background image

 

O

PERATING 

I

NSTRUCTIONS

T

URBIDITY 

L

IMIT

-V

ALUE 

E

VALUATION 

U

NIT 

TURBISWITCH

 

GS4

WITH 

M

EASURING 

S

ENSOR OR 

I

MMERSION 

P

ROBE

 

BAMO IER GmbH 

 Pirnaer Str. 24

 D-68309 Mannheim, Germany

 

Phone: +49 (0)621 84224-0 

 Fax: +49 (0)621 84224-90, e-mail: [email protected]   

   Internet: www.bamo.de 

SU3547f.doc

   12/18 

6

 

Installing and Connecting the Immersion Probe: 

 

The following measuring ranges apply when the TURBISWITCH CP2 immersion probe is used: 
Minimum acquirable turbidity in the low range begins at roughly 100 to 300 FAU. 
Maximum acquirable turbidity in the high range:  

Approx. 30,000 FAU i.e. roughly 100 g/l SiO2 

Maximum acquirable turbidity in the medium range: 

10% of the high range 

Maximum acquirable turbidity in the low range:   

1% of the high range 

 

Installing the immersion probe: 

The TURBISWITCH CP2 immersion probe is intended for installation into slurry tanks, open troughs and containers 
for monitoring turbidity, or as a sludge level indicator. 
Install the probe so that it can be easily removed for cleaning. 
Cleaning intervals depend on operating conditions. 
Do not scratch the lenses while cleaning! 

 

Installing the TURBISWITCH CP2 ZK/Z0 immersion probe: 

Z0: Shipped without installation materials. 
ZK: Install using the included mounting bracket and adjuster fitting. 

Attention: 

In the case of powerful flow or viscous media, the cable may not be 
overstretched. If this is the case, a strain relief must be secured to the two 
holes in the base of the probe (cord, retaining rod or the like). The holes are 
laid out so that M6 threads can be cut into them if required.

 

 

Installing the TURBISWITCH CP2 ZR immersion probe: 

For permanent installation to tanks or basins, the CP2 immersion probe is 
available with a probe tube which can be screwed off. 

 

Electrical connection: 

 

 

Turbiswitch GS4

3

2

4

14

16

9

11

12

13

15

6

8

N

L

10-30V DC

V+

Fuse

 

Power

 

supply

RX

OC

Fa

ilu

re

Li

m

it

-v

a

lu

e

 <

<

Lim

it

-v

a

lue >

>

V+

1

Shield (supply-)

brown ()

white (Signal)

Immersion
probe

CP2-HDR

Limit-value

passed

Limit-value

underrunned

 

9

12

11

9

12

11

no

 

failure

13

 

15

failure

13 15

100-255V AC

Signaling and
controlling equipment

Switching logic

 

 
 
 
 
 
 

Attention!

 

All relays contacts are open when supply 
power is switched off.

 

Содержание TURBISWITCH GS4

Страница 1: ...f the measuring section The shorter the measuring section the more turbid the liquid can be Pulsed infrared light is transmitted from the emitter through the liquid to the receiver If the selected tur...

Страница 2: ...10 seconds the device is automatically returned to menu 0 Possible Displays Threshold value of 0 100 in the respective setting range low medium high TR receiver error or receiver not connected TT emi...

Страница 3: ...uring the test routine press and hold the pushbutton for approximately 5 seconds The display counts up 1 2 3 4 99 ST All settings are returned to their default values Switching Supply Power On After s...

Страница 4: ...irection of flow Direction of flow Direction of flow Receiverr Emitter Horizontal mounting top view Receiver Emitter Bypass mounting top view Emitter Vertical mounting Receiver Emitter Emitter Mountin...

Страница 5: ...eceiver O Ring Electrical Connection IR light 3 2 4 14 16 9 11 12 13 15 6 8 N L 10 30V DC TT HDR V Fuse Power supply RX OC Receiver Failure Limit value Limit value V 1 Emitter TR HDR Emitter Receiver...

Страница 6: ...r cleaning Cleaning intervals depend on operating conditions Do not scratch the lenses while cleaning Installing the TURBISWITCH CP2 ZK Z0 immersion probe Z0 Shipped without installation materials ZK...

Страница 7: ...icles the switching command can be delayed by adjusting delay time TD to a value of up to 9 9 seconds A fluttering switching point can be avoided by increasing reset hysteresis HY Troubleshooting duri...

Отзывы: