background image

Assembling procedure

1) Prepare a cement platform perfectly straight and level to fix the 
    body. On the center of this platform place the plastic pipes  for the 
    electrical wiring and the fixing plate .

3) Fix the body on  the fixing plate.
4) Install the arm in the arm support (see pag. 9/10).
5) Unlock the motoreducer (pag. 5) and set the spring using the 
    regulation screw placed below the spring. Check that 

 

the arm

    movement is smooth and uniform. (see pag. 11 ) 

.

6) Lock the motoreducer (pag 5), and proceed with the electrical 
    wiring (see attached manual).
7) Verify that the arm stops in horizontal position (closing) 
    and vertical position (opening).
    If this position is to be adjusted, check the limitswitch magnets
    and the rubber vibration dumpers 

(see pag.11)

217

1

3

0

Hole diameter 15 mm

Screws diameter 12 mm

Are advise to be used

Ø

0

 5

FIG.2

3

Barrier

RX

Photocell

AREA TO BE PROTECTED WITH SAFETY DEVICE

TX

Photocell

Fork

Arm

BEFORE PROCEEDING WITH INSTALLATION
MAKE  SURE THAT THE OPERATING FIELD
OF THE BARRIER IS FREE FROM OBSTACLES
AND ELECTRIC CABLES.

TX

RX

RX

Magnetotermic

switch

Differential switch

CABINET FIXING

Cement

platform

Fixing screw

Plastic pipe

for electrical 

Fixing plate

wiring

FIG. 1    

230V

0V

ATTENTION:

BAME s.r.l. is liable only for the individual articles produced and sold by BAME. The gate with the 
motor it’s considered a machine and must respect the machinery directives, the installer must verify 
the safety of the gate with the motor and is liable for any damage due to a poor installation.
BAME is not liable for any damage depending on modifications to any particular: electrical, electronic 
or mechanical done by other persons without prior consent by BAME s.r.l..
BAME is not liable for any damage depending on accessories, electronic control boards and 
photocells without BAME trademark or for the use of these parts without prior consent by BAME s.r.l..

2) Use suitable screws to fix the plate on the platform.

DO NOT REGULATE

THE BARRIER WITH 
THE MOTOR IN 

FUNCTION!!

FIG.3

Содержание Delma LUX

Страница 1: ...1 ELECTROMECHANICAL ROAD BARRIERS FOR 2 5 MT 4 MT 5 MT 6 MT ENTRANCES 24 Vcc INTENSIVE USE READ CAREFULLY BEFORE PROCEEDING WITH INSTALLATION Installer manual KEEP THIS MANUAL FOR FUTURE USE LUX ...

Страница 2: ...th explosives mixtures WARNING Moving gears WARNING Keep safety distance 2 IP protection class IP 55 Electromechanical road barriers for passages from 2 5 mt up to 6 mt with low voltage electric motors for intensive use and extensible aluminium round arm The cabinet treated with electrophoresis and painted in epoxy powder can be used in any climatic condition Available with mobile foot and articul...

Страница 3: ...hotocell Fork Arm BEFORE PROCEEDING WITH INSTALLATION MAKE SURE THAT THE OPERATING FIELD OF THE BARRIER IS FREE FROM OBSTACLES AND ELECTRIC CABLES TX RX RX Magnetotermic switch Differential switch CABINET FIXING Cement platform Fixing screw Plastic pipe for electrical Fixing plate wiring FIG 1 230V 0V ATTENTION BAME s r l is liable only for the individual articles produced and sold by BAME The gat...

Страница 4: ...arm if installed see ARM REMOVAL pag 10 6 Unscrew completely the regulation nut of the spring PART F 7 Remove the articulated joint PART D of the balancing lever PART B and place it on the true in the opposite side 8 Insert the regulation screw in the left hole and screw the regulation nut of the spring 9 Tighten the screw on the balancing lever 10 Check the proper balancing of the arm the regulat...

Страница 5: ... To lock the barrier turn the knob anticlockwise 5 Replace the protection panel and lock it with the key FIG 6 FIG 7 5 ATTENTION THIS SHEET MUST BE CONSIGNED TO THE CLIENT ATTENTION THE CUSTOMER MUST KEEP THIS SHEET TOGETHER WITH THE UNLOCKING KEY IN A SAFE PLACE THE PLACE WHERE THE KEY IS STORED MUST BE ACCESSIBLE ALSO IN CASE OF POWER FAILURE ATTENTION INFORM ALSO OTHER USERS OF THE AUTOMATION A...

Страница 6: ...s 2 sensitive edges 3 photocells 4 swing stoppers 5 torque limiter 6 surface modelling 7 footboards 8 radar 9 acustic signal 10 visual signal 11 markings 12 isolation 13 protection net 14 15 Electrical risks CE markings are present in compliance with the directive BT 73 23 CEE All electrical connections are made in compliance with standard specifications also according to the manufacturer manual T...

Страница 7: ...23 EEC 89 336 EEC 98 37 EEC and subsequent modifications Furthermore declare that the following standard specifications have been applied EN12453 EN12445 Safety for motorised doors and gates industrial commercial and residential Requisites and classification Test methods EN12604 EN12605 Mechanical aspects for doors and gates industrial commercial and residential Requisites and classification Test ...

Страница 8: ...ies all the technical regulations applicable to the product within the scope of Council Directives MACHINERY DIRECTIVE 98 37 CEE AND SUBSEQUENT MODIFICATIONS DIRECTIVE EMC 89 336 CEE DIRECTIVE BT 73 23 CEE AND 93 68 CEE IS FORBIDDEN TO PUT INTO SERVICE THE DEVICE OF THIS DECLARATION BEFORE THE PRODUCT OF THE DECLARATION A HAS BEEN DECLARED IN COMPLIANCE WITH THE SPECIFICATIONS STANDARD San Giacomo...

Страница 9: ... uniform 3 Remove the arm support keeping the arm in vertical position DANGER OF FATAL INJURIES 1 Move the arm in the opening position and lock the motor ARM SUPPORT Arm fixing 8 Adjust the spring tension pag 11 SCREWS M8x16 4 Put the arm on the floor carefully the screws and the self locking nuts M8x16 M8 2 Unlock the motor page 5 3 Put down the arm carefully Arm removal 4 Lock the motor BARRIER ...

Страница 10: ...Junction 50 cm 115 cm 32 cm 100 cm 100 cm 100 cm 32 cm 100 cm 100 cm 100 cm 32 cm 100 cm 100 cm 100 cm 32 cm 100 cm 100 cm 100 cm 100 cm 100 cm 100 cm 100 cm Junction 100 cm 100 cm 100 cm 100 cm 2 80 mt Transit width 2 50 mt 5 0 mt Round arm L 5 40 mt transit width 5 0 mt L 4 30 mt transit width 4 mt N 5 Reflectors per side 5 0 mt of protective rubber Total weight 7 3 Kg 6 0 mt Round arm L 6 40 mt...

Страница 11: ...10 ASSEMBLING THE ARM JUNCTION ...

Страница 12: ... the reducer 2 Set the arm in the opening position 3 Lock the reducer 4 Turning the tensioning nut tension the spring until obtaining the best setting Verification of the best setting 1 Unlock the reducer 2 Carefully bring the arm in the closed position 3 Release the arm 4 If the spring is tensioned correctly the arm should open and stop at about 30 degree The spring should be tensioned during the...

Страница 13: ...nd accessories are guaranteed for a period of 24 months after production whose date is printed on each item The company will replace or repair its devices provided that they are returned to our factory with the warranty label in good conditions In case of replacement of the returned items these will remain property of the company The warranty does not i nclude damages due to any incorrect use such...

Отзывы: