UP
L
THE POST (L) HAS BEEN
PRE-DRILLED
PLACE THE BOTTOM HALF OF
THE OUTER SHELL, OVER
THE SCREW HOLES AND
SECURE USING THE LONG
SCREWS.
THE CUTOUT IS TO THE TOP.
INSERT THE WIRE GUIDE
INTO THE CUTOUT. (HOLE
TO THE RIGHT).
NEXT, INSERT THE WINCH
MECHANISM,
AND SECURE USING THE 4 SCREWS.
PLACE THE TOP COVER ONTO
THE WINCH,
AND SECURE USING THE 2
SMALL SCREWS.
YOUR WINCH SHOULD LOOK
LIKE THIS.
WINCH INSTRUCTIONS