BURNER CONNECTION TO THE BOILER
HEAD UNIT ASSEMBLY
•
Adjust the position of the coupling flange (19) by loosening the
screws (6) so that the burner head enters the furnace to the extent
recommended by the generator manufacturer.
•
Position the insulating gasket (13) on the sleeve, by inserting the
cord (2) between the flange and the gasket.
•
Fasten the head unit flange (14)to the boiler(19) by means of the
stud bolts, washers and nuts provided (7).
DANGER / ATTENTION
Seal the space between the burner sleeve and the hold on the
refractory material inside the boiler door completely with sui
-
table material.
ASSEMBLING THE GAS TRAIN
The gas train can be assembled 8, 8a 9 9a in different ways.
TBG 85 ÷ 260 MC / 260LX MC
(8) - (8a)
TBG 360 MC / LX MC
(9)
DANGER / ATTENTION
In case of very large valves, e.g. DN65 or DN80, make sure
there is a suitable support to prevent excessive stress on the
gas train fitting.
ASSEMBLY OF VENTILATION SYSTEM
Position the half-hinge on the burner scroll in line with those on the
combustion head assembly.
•
Insert the hinge pin (10) in the position considered most suitable
•
Connect the cables (switch on and ionisation) to the corresponding
electrodes, close the hinge, locking the burner by means of screws
(11).
•
Insert the gas throttle control lever on the shaft and block it with
the specific nut.
1
2
13
0002934720
19
7
6
ENGLISH
12 / 34
0006160008_201912
Содержание TBG 85 MC
Страница 2: ......
Страница 35: ...SCHEMI ELETTRICI ITALIANO 33 34 0006160008_201912...
Страница 69: ...WIRING DIAGRAMS ENGLISH 33 34 0006160008_201912...
Страница 71: ......