87
21
-2
pressostato.tif
ionizzazione LME
19 / 22
0006080749_201307
ENGLISH
generaL DIagram for tWo-Stage L.p.g. preSSUre reDUCtIon for BUrner or BoILer
aIr preSSUre SWItCH
Regulate the air pressure switch after first carrying out all the other
burner adjustments with the air pressure switch adjusted to the start
of the scale. With the burner operating at a low flow rate (1st flame),
slowly turn the central screw clockwise until the burner locks out.
Then give the screw a half-turn anti-clockwise and repeat burner
start-up to check for proper operation. If the burner locks out again
give the screw another half-turn.
IonIZatIon CUrrent
The minimum current needed to run the apparatus is 3µA.
The burner provides a significantly higher current and therefore
does not normally require any checks at all. In case, the ionisation
current need to be measured a microammeter must be connected
in series to the ionization electrode lead by opening the connector
“C” as illustrated in the figure.
Pressure gauge and pressure intake
2nd step reducer
Output ~ 30 mbar
Flow rate ~ double the maximum required by the user
Filter (steam type)
Filter (steam type)
Pressure intake
Ball cock
Filter
Filter
Vibration-proof joint
Burner
Freestanding or wall-mounted boiler
1st step reducer
Output ~30 mbar
Flow rate ~ double
t h e m a x i m u m
required by the
user
2nd step reducer
Output ~ 30 mbar
Flow rate ~ double the maximum
required by the user
Tank
L.P.G.
Содержание BTG 3,6
Страница 2: ......
Страница 4: ......
Страница 24: ...22 22 0006080749_201307 ITALIANO...
Страница 26: ......
Страница 46: ...22 22 0006080749_201307 ENGLISH...
Страница 48: ......
Страница 68: ...22 22 0006080749_201307 ESPA OL...
Страница 70: ......
Страница 90: ...22 22 0006081099_201307 FRAN AIS...
Страница 92: ......
Страница 112: ...22 22 0006080749_201307 DEUTSCH...
Страница 113: ......