About Rigging and Installation
The BAC equipment should be rigged and installed as outlined in this bulletin.
These procedures should be thoroughly reviewed prior to the rigging and operation to acquaint all personnel with
the procedures to be followed and to assure that all necessary equipment will be available at the jobsite.
Recommended Maintenance and
Monitoring Programme
Inspections and Monitoring
Start-Up
Monthly
Quaterly
Every 6 Months
Annually
Shutdown
General condition
X
X
ICE CHILLER
®
Tank
X
X
ICE CHILLER
®
Water
(1)
- Quality
- Level
X
X
X
X
Ice Thickness
X
X
Coil
X
ICE LOGIC™ Ice Quantity controller:
- condition of sensor
- conductivity of tank water
X
X
X
Air Pump
- Air Filter Replacement
X
X
X
Refrigerant:
- Glycol quality
- NH
3
purge oil
X
X
Air Distribution Piping
X
Cleaning procedures
Start-Up
Monthly
Quaterly
Every 6 Months
Annually
Shutdown
Mechanical cleaning
- Air filter
X
X
X
X
X
Disinfection
X
X
X
Notes
1. Water Treatment and auxiliary equipment integrated in the cooling system may require additions to the table
above. Contact suppliers for recommended actions and their required frequency.
2. Recommended service intervals are for typical installations. Different environmental conditions may dictate
more frequent servicing.
3. When operating in ambient temperatures below freezing, the unit should be inspected more frequently.
W W W . B A L T I M O R E A I R C O I L . E U
2
Содержание TSU 95C
Страница 16: ...W W W B A L T I M O R E A I R C O I L E U 16...
Страница 17: ...W W W B A L T I M O R E A I R C O I L E U...
Страница 18: ...W W W B A L T I M O R E A I R C O I L E U...
Страница 19: ...W W W B A L T I M O R E A I R C O I L E U...