background image

4

6.)

5.) Slide the Monitor Mount (P4) down the

 Pole (P2) above the Main Platform (P3)and
tighten the clamp lever down to lock in place.
See illustration #4.

Illustration # 4

P4

P2

Clamp Lever

7.)

5A.)  To adjust the tension of the Monitor Mount (P4),
          remove caps and use the Wrenches (H) to
           tighten or loosen nuts.

Illustration # 5

C

Snap-On three Cable Ties (C) onto the  Pole (P2) .
See illustration #4.

Attach the two CPU Mounts (P5) to the  Pole (P2) using four Screws (J) through two CPU Mount
Clamps (P6)  as shown in illustration #5.  Tighten Screws (J) with Allen Wrench (E).

7a.)  Use two CPU Straps (I) through
the slots in the CPU Mounts (P5) to
secure your CPU in place.  See
illustration #5a.

27614_07-25-12

P3

I

I

P5

P5

P5

P6

J

P2

Illustration # 5a

Отзывы: