4
6.)
5.) Slide the Monitor Mount (P4) down the
Pole (P2) above the Main Platform (P3)and
tighten the clamp lever down to lock in place.
See illustration #4.
Illustration # 4
P4
P2
Clamp Lever
7.)
5A.) To adjust the tension of the Monitor Mount (P4),
remove caps and use the Wrenches (H) to
tighten or loosen nuts.
Illustration # 5
C
Snap-On three Cable Ties (C) onto the Pole (P2) .
See illustration #4.
Attach the two CPU Mounts (P5) to the Pole (P2) using four Screws (J) through two CPU Mount
Clamps (P6) as shown in illustration #5. Tighten Screws (J) with Allen Wrench (E).
7a.) Use two CPU Straps (I) through
the slots in the CPU Mounts (P5) to
secure your CPU in place. See
illustration #5a.
27614_07-25-12
P3
I
I
P5
P5
P5
P6
J
P2
Illustration # 5a