Page 2 of 7
Online: www.ballarddesigns.com
NOTE: Assemble the
Tower
in desired location for use.
Hardware Located
Here (A-G)
Shelves (H,I)
TOOLS NEEDED:
-Requires a screwdriver.
-Power drill suggested.
-Assembly requires 2 or more people.
NOTE: When unpacking, lay the parts on
a padded surface such as the packaging provided.
Be sure to locate all hardware before throwing
away any packaging.
Customer Service: 800-367-2810
Ltr.
Qty.
Components
H
3
Glass Shelves (H)
I
1
Shelf (I)
Ltr.
Qty.
Hardware Included
Ltr.
Qty.
Hardware Included
A
16
Shelf Supports
E
2
Connector Plates
B
8
Long Screws
F
4
Connector Screws
C
8
Small Screws
G
4
Wood Plugs
D
2
L-Brackets