2
POWER ON
1.Main Unit Installation
2.Sensor Installation
AC Hole
Step1, Peel off the protecting
mask of main unit.
Step 3, Remove the the insulation strip
Switch to CH1
Switch to CH2
Switch to CH3
Step 1, Switch the
channels in order
Step 2,Plug the AC Adaptor
to a powered outlet.
Step 2, Load the 2xAA batteries
in 3 minutes to ensure RF
signal received in time.