Baker Instrument Company D12R Скачать руководство пользователя страница 6

 
 

2/24/2010 | 71-018 V11 EN  
D12R, D6R, D3R Users Manual 

 

Supplement 3 .................................................................................................................................................83

 

PP40 power pack...........................................................................................................................................83

 

Important safety information...............................................................................................................83

 

Other Important Safety warnings .......................................................................................................84

 

Emergency Shut-Off Button................................................................................................................85

 

Initial set-up ...........................................................................................................................................85

 

Output configuration .............................................................................................................................85

 

Power pack operation ...............................................................................................................................86

 

Surge testing..........................................................................................................................................86

 

DC HiPot testing ....................................................................................................................................87

 

Note regarding 220/240 VAC units....................................................................................................88

 

Output configuration .............................................................................................................................88

 

Operating and shipping position..........................................................................................................88

 

Lifting the instrument ...........................................................................................................................89

 

Supplement 4 .................................................................................................................................................91

 

AT101D Bar-to-bar armature testing .......................................................................................................91

 

Other Important Safety warnings .......................................................................................................91

 

Operation ................................................................................................................................................93

 

Determination of a fault .......................................................................................................................94

 

Application recommendations..................................................................................................................95

 

Specifications for the AT101D Bar-to-bar armataure testing accessory ....................................95

 

Appendix A Winding Faults...........................................................................................................................97

 

Appendix B Troubleshooting ........................................................................................................................99

 

Self help and diagnostics ..........................................................................................................................99

 

Step #1:  Basic information ................................................................................................................99

 

Step #2:  Applications or service problem? ......................................................................................99

 

Applications:  What to do first! ................................................................................................................99

 

Other Important Safety warnings .................................................................................................... 100

 

Common application problems......................................................................................................... 101

 

Service:  What to do first? ................................................................................................................ 102

 

Open condition display....................................................................................................................... 102

 

HiPot display checks........................................................................................................................... 103

 

HiPot over current trip check ........................................................................................................... 103

 

Open ground check ............................................................................................................................ 104

 

Limited output surge waveform....................................................................................................... 104

 

Warranty return...................................................................................................................................... 104

 

Appendix C Technical specifications and calibration .............................................................................. 107

 

Technical specifications...................................................................................................................... 107

 

Accuracy of measurements - Coil Resistance test ........................................................................ 108

 

Testing Accuracy - HiPot Measurements ....................................................................................... 108

 

Voltage measurement accuracy – Surge (D12R) .......................................................................... 108

 

Voltage measurement accuracy – Surge (D6R/D3R) ................................................................... 108

 

Calibration information ...................................................................................................................... 108

 

Index.............................................................................................................................................................. 109

 

 

Содержание D12R

Страница 1: ...rby equipment Information furnished in this manual by Baker Instrument Company an SKF Group Company is believed to be accurate and reliable However Baker Instrument Company an SKF Group Company assume...

Страница 2: ...Buyer returns Products accessories or options to the Baker SKF factory for warranty service Baker SKF will bear the cost of return packaging and shipping and insurance on the return shipment For Produ...

Страница 3: ...ctions 13 On line labels 14 Safety precautions for setup 14 Initial tester power up and checkout 15 Using the footswitch 15 2 17 Test sequence voltages applicable standards 17 Recommended testing sequ...

Страница 4: ...tion Notes 44 Single phase motors and two terminal devices 44 Determination of a fault 44 Form coils 45 Determination of a fault 45 Notes and tips for form coils 45 Three phase motors 46 Determination...

Страница 5: ...nnection 69 Single phase lead connections 69 Note regarding 220 240 VAC units 69 Lifting the instrument 70 Supplement 2 71 PP185 power pack 71 Important safety information 71 Other Important Safety wa...

Страница 6: ...Bar to bar armataure testing accessory 95 Appendix A Winding Faults 97 Appendix B Troubleshooting 99 Self help and diagnostics 99 Step 1 Basic information 99 Step 2 Applications or service problem 99...

Страница 7: ...ury NOTICE NOTICE is the preferred signal word to address practices not related to personal injury Other Important Safety warnings Failure to follow these precautions could result in severe electrical...

Страница 8: ...pecifications 8 Ground the product This product is grounded through the grounding conductor of the power cord To avoid electrical shock plug the power cord into a properly wired grounded receptacle be...

Страница 9: ...tion requirements The unit is intended for use in Installation Category II Portable Equipment areas and pollution Degree II Environments where occasional non conducting condensing pollution can be enc...

Страница 10: ...s amended by Council Directive 93 68 EC and Council Directive 2004 108 EC on the approximation of the laws related to Member States relating to the electromagnetic compatibility as amended by Council...

Страница 11: ...Ray Tube CRT is the location where the tester displays test information At the Top menus corresponding to the four function keys above the CRT are shown The main portion of the screen displays the wa...

Страница 12: ...nterlock is disabled when this function is selected and the Footswitch is depressed AUX The auxiliary position is for use with a 30kV Power Pack The display will also show wave patterns from accessory...

Страница 13: ...rn 15 Leads energized indicator light This indicator light will illuminate when voltage is applied during a test V fast up When pressed this control will increase the applied voltage to a motor at an...

Страница 14: ...4 Seconds Div or micro Amps Div Setting Seconds division is displayed here during Surge Testing The micro amps division setting is displayed here during HiPot Testing Safety precautions for setup Ther...

Страница 15: ...y upon power up on and assures a positive ground is available to the tester If the instrument is not properly grounded the Open ground indicator will light and testing cannot proceed Check the supply...

Страница 16: ...Instrument Overview 2 24 2010 71 018 V11 EN D12R D6R D3R Users Manual 16...

Страница 17: ...ually low megohm value when compared to previous measurements or industry accepted limits for the type of insulation in the motor If a low megohm value is measured the motor should be inspected for gr...

Страница 18: ...vation for even doing the DA test is to reduce the test time to 3 minutes instead of 10 minutes for the PI test when the PI test may not be worthwhile To date there are no accepted values for the DA H...

Страница 19: ...1372 1029 575 469 1643 1232 600 490 1715 1286 2300 1878 6573 4930 4160 3397 11888 8916 6900 5634 19718 14789 13800 11268 39437 29578 IEC 34 15 V Line Per Unit 1 2 x 50 4E 5000 0 2us 65 480 392 6920 4...

Страница 20: ...chines IEEE 429 1972 Evaluation of Sealed Insulation Systems for AC Electric Machinery Employing Form Wound Stator Coils IEEE 432 1992 Guide for Insulation Maintenance for Rotating Electrical Machiner...

Отзывы: