background image

10 | Baker Hughes 

© 2021 Baker Hughes Company. All rights reserved. 

 

 

8.3.2.  Start-up 

 

 

Before switching on or after doing any work on the device, always tighten the cover (C) with a 
seal (J) in good condition and put back the safety screw (V). 

 

Check  that  the  cable  gland  is  certified  for  the  intended  use  and  that  the  electrical  data  are 
suitable for the operating zone. 

 

Note:

 

Before start-up, proceed, if required, with instrument calibration as per §9 and/or ensure that all 
the safety instructions in the preceding paragraphs have been strictly followed. 

 
 
 

9.  Calibration of the 7700E Positioner 

 

 

Comply with current national and local regulations for electrical installation work. 

 

Must be installed and put into service in conformance with national and local regulations applicable 
for explosive atmospheres. 

 

Before carrying out any work on the device, power off the instrument or make sure that the local 
conditions in the potentially explosive atmosphere permit the safe opening of the cover. 

 

Connect the wires to the instrument

’s terminals taking care of complying with polarities and 

maximum voltage allowed 

 

Before switching on or after doing any work on the device, always tighten the cover (C) with a 
seal (J) in good condition and put back the safety screw (V). 

The positioner assembled on valve is factory-calibrated, but if it is necessary to remake the calibration on 
the site, it will be carried out by the customer according to the following general principles  

 

Make the pneumatic and electrical connections, see 

§7 

and 

§8.

 

 

The adjustment of the starting pressure is made by screw (K116). Calibrate the electrical signal 
corresponding to the closing of the valve (4 or 20 mA). Turn the take-up screw (K116) until the piston 
rod just begins to move (the plug leaves the contact with the seat ring). 

 

Tighten the locknut (K117). 

 

Strictly follow safety instructions under 

§12

 before putting into service 

 

Note: the I/P 4000 module does not require any adjustment. 
 
 

Содержание Masoneilan 7700E

Страница 1: ...Baker Hughes Data Classification Public Masoneilan Type 7700EElectro Pneumatic Positioner with I P 4000 Converter Ukrainian UA TR Instruction Manual Rev A...

Страница 2: ...REQUIREMENTS FOR OPERATION OF OTHER EQUIPMENT AT THE SITE THESE INSTRUCTIONS DO NOT PURPORT TO COVER ALL DETAILS OR VARIATIONS IN EQUIPMENT NOR TO PROVIDE FOR EVERY POSSIBLE CONTINGENCY TO BE MET IN...

Страница 3: ...Assembly of a 7700E Positioner on a Valve 7 7 Pneumatic Connection of Positioner 7700E 7 8 Electrical Connection Installation and Start Up 7 8 1 Conduit entry in flameproof application 8 8 2 Electrica...

Страница 4: ...y qualified and competent professionals who have undergone suitable training for instrumentation used in areas with potentially explosive atmospheres Such trainings are not supported by Baker Hughes I...

Страница 5: ...pneumatic signal Model 7700E electro pneumatic positioner can be used only on Varipak valve 28000 2 Numbering System Unique positioner 7700 E with I P 4000 module Different versions Housing material...

Страница 6: ...Pi 0 33 W Li 0 Ci 0 IP66 Warning Potential electrostatic charging hazard See instructions for safe use 5 Flameproof Marking and Electrical Safety Parameters The marking on the serial plate stamped on...

Страница 7: ...Series instruction manual Ref 30857 for more details 7 Pneumatic Connection of Positioner 7700E Make sure that the air supply pressure is suitable for the installation and for the instrument When usin...

Страница 8: ...y on the single NPT ANSI ASME B1 20 1 housing conduit connection The cable entry has to be suitable to the equipment operating zone IP 6X for zones 20 21 and 22 If an adaptor or reducer is needed it m...

Страница 9: ...allation for explosible atmosphere with d protection mode Intrinsically safe installation for explosible atmosphere with ia protection mode Note It is under the user responsibility to check the instal...

Страница 10: ...ke sure that the local conditions in the potentially explosive atmosphere permit the safe opening of the cover Connect the wires to the instrument s terminals taking care of complying with polarities...

Страница 11: ...ment are not damaged In the event of damage replace the defective parts with genuine manufacturer s replacement parts Pay particular attention to the following o General condition of the housing o Che...

Страница 12: ...vertical position uppermost the required ingress protection against water is invalidated therefore it shall only be installed in this orientation if its location provides protection against falling wa...

Страница 13: ...ss 123112 Russia Moscow Presnenskaya embankment house 10 room III floor 3 room 22 Tel 7 495 739 68 11 MoscowHelpDesk bakerhughes com 14 Design and Manufactured by Products are designed and controlled...

Страница 14: ...PT requirements of ANSI ASME B1 20 1 A minimum of 5 threads provided on each part MOUNTING RULE Thread cleaning with Loctite 7063 or equivalent product with similar efficiency Cemented with Loctite 27...

Страница 15: ...com Copyright 2021 Baker Hughes Company All rights reserved Baker Hughes provides this information on an as is basis for general information purposes Baker Hughes does not make any representation as t...

Отзывы: