![Bake Max BMPM007 Скачать руководство пользователя страница 6](http://html.mh-extra.com/html/bake-max/bmpm007/bmpm007_operation-manual_467549006.webp)
2. INSTALLATION
BEFORE INSTALL YOUR MIXER, CHECK TO BE SURE THAT YOUR
ELECTRICAL SERVICE SPECIFICATIONS MATCH THOSE OF YOUR
MIXER AS PRINTED ON THE MIXER'S NAMEPLATE.
2-1 LOCATION
Place the mixer in its operating location. Bench should be placed on a sturdy level surface. There should
be adequate space around the mixer for the user to operate the control and install and remove bowls.
2-2 ELECTRICAL CONNECTIONS (Cord Connected Mixers)
WARNING:
THIS SUPPLY CORD ON THIS MACHINE IS PROVIDED WITH A
THREE-PRONG GROUNDING PLUG IT IS IMPERATIVE THAT THE
OUTLET TO WHICH THIS PLUG IS CONNECTED BE PROPERLY
GROUNDED. IF THE RECEPTACLE IS NOT THE PROPER
GROUNDING TYPE, AN ELECTRICIAN SHOULD BE CONTACTED.
2-3 INSTALLATION DIAGRAM (MM)
Содержание BMPM007
Страница 1: ...BMPM007 Operation Manual 7 Quart Planetary mixer ...
Страница 2: ......
Страница 11: ......