INTRODUCTION
I-E96-209A
6 - 1
SECTION 6 - MAINTENANCE
INTRODUCTION
The Logic Master Module (IMLMM02) requires limited mainte-
nance. This section contains a maintenance schedule.
MAINTENANCE SCHEDULE
Perform the tasks in Table
Table 6-1. Maintenance Schedule
Task
Interval
Clean and tighten all power and
grounding connections.
Every 6 months or during plant shut-
down, whichever occurs first.
Use a static safe vacuum cleaner to
remove dust from:
Modules
Module Mounting Unit
Fan Assembly
Power Entry Panel
Termination Units/Modules