background image

 

 

Force Majuere.

 Seller shall not be responsible for any delay in the delivery of, or failure to deliver, Goods due to 

causes beyond Seller’s reasonable control including, without limitation, acts of God, acts of war or terrorism, enemy 
actions, hostilities, strikes, labor difficulties, embargoes, non-delivery or late delivery of materials, parts and 
equipment or transportation delays not caused by the fault of Seller, delays caused by civil authorities, 
governmental regulations or orders, fire, lightening, natural disasters or any other cause beyond Seller’s reasonable 
control. In the event of any such delay, performance will be postponed by such length of time as may be reasonably 
necessary to compensate for the delay. 
 

Installation.

  If Buyer purchases any Goods that require installation, Buyer shall, at its expense, make all 

arrangements and connections necessary to install and operate the Goods. Buyer shall install the Goods in 
accordance with any Seller instructions and shall indemnify Seller against any and all damages, demands, suits, 
causes of action, claims and expenses (including actual attorneys’ fees and costs) arising directly or indirectly out 
of Buyer’s failure to properly install the Goods. 
 

Work By Others; Safety Devices.

  Unless agreed to in writing by Seller, Seller has no responsibility for labor or 

work performed by Buyer or others, of any nature, relating to design, manufacture, fabrication, use, installation or 
provision of Goods. Buyer is solely responsible for furnishing, and requiring its employees and customers to use all 
safety devices, guards and safe operating procedures required by law and/or as set forth in manuals and instruction 
sheets furnished by Seller. Buyer is responsible for consulting all operator manuals, ANSI or comparable safety 
standards, OSHA regulations and other sources of safety standards and regulations applicable to the use and 
operation of the Goods. 
 

Remedies.

  Each of the rights and remedies of Seller under this Agreement is cumulative and in addition to any 

other or further remedies provided under this Agreement or at law or equity. 
 

Attorney’s Fees.

  In the event legal action is necessary to recover monies due from Buyer or to enforce any 

provision of this Agreement, Buyer shall be liable to Seller for all costs and expenses associated therewith, 
including Seller’s actual attorney fees and costs. 
 

Governing Law/Venue.

  This Agreement shall be construed and governed under the laws of the State of 

Wisconsin, without application of conflict of law principles. Each party agrees that all actions or proceedings arising 
out of or in connection with this Agreement shall be commenced, tried, and litigated only in the state courts sitting in 
Manitowoc County, Wisconsin or the U.S. Federal Court for the Eastern District of Wisconsin. Each party waives 
any right it may have to assert the doctrine of “forum non conveniens” or to object to venue to the extent that any 
proceeding is brought in accordance with this section. Each party consents to and waives any objection to the 
exercise of personal jurisdiction over it by courts described in this section. Each party waives to the fullest extent 
permitted by applicable law the right to a trial by jury. 
 

Summary of Return Policy. 

  10 Day acceptance period  from date of delivery. Damage claims and order discrepancies will not be accepted 

after this time. 

  You must obtain a Baileigh issued RGA number PRIOR to returning any materials. 

  Returned materials must be received at Baileigh in new condition and in original packaging. 

  Altered items are not eligible for return. 

  Buyer is responsible for all shipping charges. 

  A 30% re-stocking fee applies to all returns. 

 
Baileigh Industrial makes every effort to ensure that our posted specifications, images, pricing and product 
availability are as correct and timely as possible. We apologize for any discrepancies that may occur. Baileigh 
Industrial reserves the right to make any and all changes deemed necessary in the course of business including but 
not limited to pricing, product specifications, quantities, and product availability. 
 

For Customer Service & Technical Support: 

Please contact one of our knowledgeable Sales and Service team members at: 
(920) 684-4990 or e-mail us at [email protected] 

Содержание PH-28A

Страница 1: ...DUSTRIAL INC IS PROHIBITED Baileigh Industrial Inc does not assume and hereby disclaims any liability for any damage or loss caused by an omission or error in this Operator s Manual resulting from accident negligence or other occurrence Rev 04 2018 Baileigh Industrial Inc P O Box 531 Manitowoc WI 54221 0531 Phone 920 684 4990 Fax 920 684 3944 sales baileigh com ...

Страница 2: ...CKING AND CHECKING CONTENTS 9 Cleaning 9 TRANSPORTING AND LIFTING 10 INSTALLATION 11 MOUNTING AND ASSEMBLY 12 SETUP 12 Tooling Installation 12 Tooling Clearance Adjustment 13 Air Setting 13 OPERATION 14 LUBRICATION AND MAINTENANCE 15 Pneumatic Care 15 PARTS DIAGRAM 16 FRAME 17 PNEUMATICS 18 ANVIL RAM 19 QUICK RELEASE 20 HAMMER HEAD PRE 2018 21 Parts List 22 HAMMER HEAD 2018 AND AFTER 24 ...

Страница 3: ...ce to Seller of any suspected defect in the Goods prior to the expiration of the warranty period The original end user must also obtain a RGA from Seller prior to returning any Goods to Seller for warranty service under this paragraph Seller will not accept any responsibility for Goods returned without a RGA The original end user shall be responsible for all costs and expenses associated with retu...

Страница 4: ...r or further remedies provided under this Agreement or at law or equity Attorney s Fees In the event legal action is necessary to recover monies due from Buyer or to enforce any provision of this Agreement Buyer shall be liable to Seller for all costs and expenses associated therewith including Seller s actual attorney fees and costs Governing Law Venue This Agreement shall be construed and govern...

Страница 5: ... Description of the functional parts of the machine Capacity charts Setup and start up instructions Machine operation Scheduled maintenance Parts lists GENERAL NOTES After receiving your equipment remove the protective container Do a complete visual inspection and if damage is noted photograph it for insurance claims and contact your carrier at once requesting inspection Also contact Baileigh Indu...

Страница 6: ...azardous situation which if not avoided will result in death or serious injury WARNING Indicates a hazardous situation which if not avoided could result in death or serious injury CAUTION Indicates a hazardous situation which if not avoided could result in minor or moderate injury NOTICE Indicates a situation which if not avoided could result in property damage IMPORTANT PLEASE READ THIS OPERATORS...

Страница 7: ...olonged exposure to loud noise can cause impairment or loss of hearing Wear suitable hearing protective devices such as ear muffs or earplugs to protect against objectionable or uncomfortable loud noises BEWARE OF CRUSH HAZARD NEVER place your hands fingers or any part of your body in the die area of this machine WARNING This machine has a maximum operating pressure of 120 PSI Exceeding the maximu...

Страница 8: ...eigh does not recommend or endorse making any modifications or alterations to a Baileigh machine Modifications or alterations to a machine may pose a substantial risk of injury to the operator or others and may do substantial damage to the machine Any modifications or alterations to a Baileigh machine will invalidate the machine s warranty PLEASE ENJOY YOUR BAILEIGH MACHINE PLEASE ENJOY IT SAFELY ...

Страница 9: ...ll times DO NOT reach over or across a running machine 13 Stay alert Watch what you are doing and use common sense DO NOT operate any tool or machine when you are tired 14 Check for damaged parts Before using any tool or machine carefully check any part that appears damaged Check for alignment and binding of moving parts that may affect proper machine operation 15 Observe work area conditions DO N...

Страница 10: ...L SUPPORT Our technical support department can be reached at 920 684 4990 and asking for the support desk for purchased machines Tech Support handles questions on machine setup schematics warranty issues and individual parts needs other than die sets and blades For specific application needs or future machine purchases contact the Sales Department at sales baileigh com Phone 920 684 4990 or Fax 92...

Страница 11: ...age painted surfaces Follow manufacturer s label instructions when using any type of cleaning product After cleaning wipe unpainted metal surfaces with a light coating of quality oil or grease for protection Important This waxy coating is NOT a lubricant and will cause the machine to stick and lose performance as the coating continues to dry WARNING SUFFOCATION HAZARD Immediately discard any plast...

Страница 12: ... to the floor Level the machine so that all the supporting feet are taking the weight of the machine and no rocking is taking place Follow these guidelines when lifting crane or hoist Always lift and carry the machine with the lifting holes provided at the top of the machine Use lift equipment such as straps chains capable of lifting 1 5 to 2 times the weight of the machine Take proper precautions...

Страница 13: ...hat they will not extend into any aisles LEVELING The machine should be sited on a level concrete floor Provisions for securing it should be in position prior to placing the machine The accuracy of any machine depends on the precise placement of it to the mounting surface FLOOR This machine distributes a large amount of weight over a small area Make certain that the floor is capable of supporting ...

Страница 14: ...ting the gap between the anvil and the hammer head setting the air pressure positioning the foot pedal in a comfortable position for the operation of the machine Tooling Installation 1 Lift the quick release handle A to raise the hammer head 2 Loosen the two clamping block bolts B 3 If needed lower the anvil ram to allow for clearance to insert the upper tool C into the hammer head 4 Align the ind...

Страница 15: ... will damage the tooling 7 Install the tool lock pin D Because the holes for the anvil ram may not align with the tool hole the anvil ram must be turned to align the holes 8 Rotate the anvil ram to increase to increase the tool clearance until the first possible set of holes will align with the tool and install the lock pin If at all possible do not increase the gap to more than 2 times the materi...

Страница 16: ...the material between the dies in a comfortable and controlled position 6 Pull the quick release handle forward to lower the hammer head to the operating position 7 Position yourself and the material so that you can clearly see the area on the material that the hammer will contact This is important for controlling the amount of forming and area of the forming of the material 8 Using the foot pedal ...

Страница 17: ...ck daily for any unsafe conditions and fix immediately Check that all nuts and bolts are properly tightened Check oil level in the lubricator refill as needed with an SAE 10 weight non detergent non additive oil On a weekly basis clean the machine and the area around it Lubricate threaded components and sliding devices Apply rust inhibitive lubricant to all non painted surfaces Note Proper mainten...

Страница 18: ...16 16 PARTS DIAGRAM ...

Страница 19: ...17 17 FRAME ...

Страница 20: ...18 18 PNEUMATICS ...

Страница 21: ...19 19 ANVIL RAM ...

Страница 22: ...20 20 QUICK RELEASE ...

Страница 23: ...21 21 HAMMER HEAD PRE 2018 ...

Страница 24: ...er 9 14 AH28 7A017 Main Pivot Shaft 1 15 BR16 6A004 V2 Cam Block 1 16 M24 Lock Washer Std 18 17 M24 x 3 0 x 50 HHCS 2 18 PP 1192 50 Steel Ball 1 19 PP 1186 5 x 1 5 Spring 1 20 ME AH 7A007 Pivot Shaft 1 21 AH 7A012 Middle Pivot Pin 1 22 M150 7A013 Quick Release Shaft 1 23 PP 0133 Black Ball Knob 1 24 PH24 6A044 Lower Tool Shaft Key 1 25 PH24 7A036 Ram Locknut 1 26 ME AH 6A019 Foot Pedal Base 1 27 A...

Страница 25: ...otted Spring Pin 1 45 PP 0837 1 25 I D x 1 50 O D x 1 50 Long 1 46 M10 x 1 5 x 20 SHCS 4 47 STD 1875 x 1 Keystock 2 48 3 4 Ext Retaining Ring Std 6 49 1 2 13 x 1 0 SHCS 2 50 PP 0322 0 75 Id x 1 25 Od x 125 THK 4 51 PP 0101 0 75 Id x 1 25 Od x 0625 THK 10 52 AH 7A015 Spacer 2 53 STD M16 x 2 0 x 30 Set Screw 1 54 M6 x 1 0 x 20 SHCS 2 55 M8 x 1 25 x 25 SHCS 2 56 M6 x 1 0 x 25 SHCS 2 57 PP 1333 1 4 NP...

Страница 26: ... 1 6 AH28 6A008 Tie Block 1 27 AH 6A018 Slide Plate R H 1 49 25 x 1 0 Slotted Spring Pin 1 50 PP 0837 1 25 I D x 1 50 O D x 1 50 Long 1 54 5 16 18 x 1 75 SHCS 4 55 3 8 16 x 75 SHCS 4 56 1 2 13 x 1 25 SHCS 2 57 5 16 18 x 1 50 SHCS 6 62 AH28 7A016 Guide Hub 1 63 AH28 7A006 V2 Clamp Block 1 ...

Страница 27: ...25 25 NOTES ...

Страница 28: ...44 www baileigh com BAILEIGH INDUSTRIAL INC 1455 S CAMPUS AVENUE ONTARIO CA 91761 PHONE 920 684 4990 FAX 920 684 3944 BAILEIGH INDUSTRIAL LTD UNIT D SWIFT POINT SWIFT VALLEY INDUSTRIAL ESTATE RUGBY WEST MIDLANDS CV21 1QH UNITED KINGDOM PHONE 44 0 24 7661 9267 FAX 44 0 24 7661 9276 WWW BAILEIGH CO UK ...

Отзывы: