9
5. Operation
Start Up
1.
2.
Inspect heater coil for damage before
using.
4.
Open
Hot Coil
®
by pulling the latch pin.
(see figure 4).
3.
Inspect area for combustibles, gaseous
or hazardous materials, and ensure the
work area is dry.
5.
Fit
Hot Coil
®
over pipe. Place units as
shown in fig. 5 with plugs at the 3 o’clock
position. (NOTE: use proper heater
coil for pipe diameter being worked on).
IMPORTANT
WARNING
DANGER
Read
ALL
instructions in the
user’s manual before using
the heater coil.
Damage to internal diameter
ceramics may expose bare
wire and cause an electrical
short.
The coil is not electrically
explosion proof. In gaseous or
hazardous enviroments, use
of electrical equipment could
result in fire or explosion.
Shock
Risk
Fire
Hazard
Latch Pin
Pipe
Hot Coils
®
Fig. 4
Fig. 5