Baicells Nova-233 G2 Скачать руководство пользователя страница 9

 

 

The Nova-233 G2 interfaces are described in Table 1-1. 

Table 1-1 Nova-233 G2

 Interface Description

 

Interface Name 

Description 

PWR 

Power interface: +48V (+42V~+60V) DC 

GPS 

External GPS antenna, N-female connector. 

ANT0 

External antenna 0, N-female connector. 

OPT 

Optical  interface,  connect  to  external  transmission  network, 

used for data backhaul. 

ETH 

RJ-45 interface, used for debug or data backhaul. 

ANT1 

External antenna 1, N-female connector. 

 

The Nova-233 G2 interface indicators are described in Table 1-2. 

Table 1-2 Nova-233 G2

 Interface Indicators

 

Identity 

Color 

Status 

Description 

PWR 

Green 

Steady On 

Power On 

OFF 

No Power Supply 

RUN 

Green 

Fast flash: 0.125s 

on,0.125s off 

The board is loading. 

Slow flash: 1s on,1s 

off 

The board is normal. 

OFF 

No power input or board fault 

ACT 

Green 

Steady On 

The transmitting channel works 

normally 

OFF 

The transmitting channel works 

abnormally 

ALM 

Red 

Steady On 

Hardware alarm, e.g. VSWR alarm 

OFF 

No alarm 

 

 

Technical Specification 

1.4

1.4.1  Hardware Specification 

Item 

Description 

LTE Mode 

LTE TDD 

LTE Band 

band48 (3550 MHz ~ 3700 MHz) 

Channel Bandwidth 

10/20 MHz   

MAX Output Power 

30dBm/Ant 

Содержание Nova-233 G2

Страница 1: ...04 All rights reserved Baicells Technologies Co Ltd Nova 233 G2 mBS1105 Outdoor LTE TDD Base Station Installation Guide...

Страница 2: ...icells copyrights this specification No part of this specification may be reproduced in any form or means without the prior written consent of Baicells Disclaimer This specification is preliminary and...

Страница 3: ...s 10 11F Bldg A1 No 1 Zhongguancun Yongfeng Industrial Base Haidian Dist Beijing China 555 Republic Dr 200 Plano TX 75074 USA Phone 400 108 0167 1 888 502 5585 Email contact Baicells com or support Ba...

Страница 4: ...lation Preparation 7 Support Materials 7 2 1 Installation Tools 7 2 2 Installation Environment 8 2 3 2 3 1 Locational Requirements 8 2 3 2 Environmental Requirements 8 2 3 3 Space Requirements 8 Perso...

Страница 5: ...6 4 Connect Optical Fiber 15 3 6 5 Connect Ethernet Cable 16 3 6 6 Connect Power Connector 16 3 6 7 Connect Ground Cable 17 Install Antenna Feeder System 17 3 7 3 7 1 Install Omnidirectional Antennas...

Страница 6: ...re 3 3 Omnidirectional Antenna Installation 1 18 Figure 3 4 Omnidirectional Antenna Installation 2 18 Figure 3 5 Assembling Procedure of Directional Antennas 19 Figure 3 6 Transportation the Antennas...

Страница 7: ...G2 can be widely used by telecom operators broadband operators enterprises and so on Features 1 2 Adopt the integration design of baseband and RF Based on 3GPP international standard LTE TDD technolog...

Страница 8: ...3 The Nova 233 G2 base station appearance is shown in Figure 1 1 Figure 1 1 Nova 233 G2 Appearance The Nova 233 G2 interfaces and indicators are shown in Figure 1 2 Figure 1 2 Nova 233 G2 Interfaces...

Страница 9: ...e indicators are described in Table 1 2 Table 1 2 Nova 233 G2 Interface Indicators Identity Color Status Description PWR Green Steady On Power On OFF No Power Supply RUN Green Fast flash 0 125s on 0 1...

Страница 10: ...S 36 104 which is based on 5MHz bandwidth FRC A1 3 in Annex A 1 QPSK R 1 3 25RB standard 1 4 2 Software Specification Item Description LTE Standard LTE TDD 3GPP Release 9 Maximum Throughput 20 MHz SA1...

Страница 11: ...on tracing Support signaling trace 1 4 3 Environment Specification Item Description Operating Temperature 40 C to 55 C Storage Temperature 45 C to 70 C Humidity 5 to 95 Atmospheric Pressure 70kPa to 1...

Страница 12: ...t occur in a particular installation If this equipment does cause harmful interference to radio or television reception which can be determined by turning the equipment off and on the user is encourag...

Страница 13: ...er plug connecting to the electricity supply Antenna RF cable 50 ohm feeder Optical fiber Single mode optical fiber Ethernet cable Outdoor CAT6 Shorter than 100m Antenna Omnidirectional or directional...

Страница 14: ...uction process so that a proper location can be chosen to meet the communication engineering environmental requirements as well as the technical requirements of network planning and communication equi...

Страница 15: ...equipment so we would recommend you to test it on the ground to make sure everything is functioning before install on the tower The operator must prepare external against lightning protector to protec...

Страница 16: ...33 G2 adopts cold shrink tube for weatherproof protection Before installing the cold shrink tube clean up the interface first The weatherproof protection steps are as follows 1 Insert cable into cold...

Страница 17: ...re consistent with the packing list Installation Procedure 3 2 The installation procedure of Nova 233 G2 is given in Figure 3 1 Figure 3 1 Installation Procedure of Nova 233 G2 Install GPS Antenna 3 3...

Страница 18: ...tion height higher than 120cm and the installation space requirements meet the requirements in 2 3 3 Space Requirements The mount bracket has been assembled before packing 1 Unscrew the four screws of...

Страница 19: ...two pins on the base station bracket to the installation bracket push the base station until the hook block to the base station bracket 4 Tighten two screws on the top of the bracket using cross scre...

Страница 20: ...n rack and then fix base station to the wall with M8 x 80 expansion bolts 5 Refer to the installation steps on pole fix base station on wall Connect Cable 3 6 3 6 1 Requirement for Cable Laying Genera...

Страница 21: ...mper to the GPS antenna 3 Push the cold shrink tube to the top joint and pull out the strip 4 Connect the other end of the GPS jumper to GPS interface of the base station which also need weatherproof...

Страница 22: ...rip 12mm insulating layer with wire stripper which is used for connection to connector It is recommended that the power cord length is kept below 100m 330 feet The connection steps of power cable is a...

Страница 23: ...cable needs to connect to a good grounding point Install Antenna Feeder System 3 7 There are two kinds of outdoor antennas omnidirectional outdoor antennas and directional outdoor antennas whose inst...

Страница 24: ...ent lightening rod should be settled between the two poles where the lightening rod must be high enough to keep all antennas under its protection cover Figure 3 3 Omnidirectional Antenna Installation...

Страница 25: ...na assembled to the platform on the iron tower as shown in Figure 3 6 Following the safety rules when working at these heights Figure 3 6 Transportation the Antennas in the Height 3 Fix the pole verti...

Страница 26: ...tion 4 When the base station has been installed in a proper position connect all the cables and wires 5 Run tests then seal and weatherproof all the connections after the testing has successfully comp...

Страница 27: ...is given in Table 4 1 Table 4 1 Nova 233 G2 Indicator Description Type Color Status Meaning PWR Green ON Have power input OFF No power input RUN Green Fast blink 0 125s on 0 125s off Single board loa...

Страница 28: ...digital device pursuant to part 15 of the FCC Rules These limits are designed to provide reasonable protection against harmful interference in a residential installation This equipment generates uses...

Отзывы: