19
Wire Connection
3.4.1 Install Feeder
After the mBS1100 is installed, connect the antenna and the base station
’s ANT1 and
ANT2 ports with feeders.
3.4.2 Install Ethernet Connector
Waterproof connector is adopted for cables.
1. Put the cable through the waterproof connector from the behind. A click sound should
be heard.
2. Connect the cable to the base
station’s WAN port through its waterproof connector,
and twist it 90 degrees, and tighten the connector, as shown in Figure 3-14.
Figure 3-14 Cable Connection
3.4.3 Install Ground Wire
Note about grounding:
Ground wire adopts yellow-green wire that is no smaller than 16 mm².
The ground interface of the base station is given in Figure 3-15.
Grounding principle: as near as possible.
The antenna feeder lightning protector and the GPS antenna feeder lightning
Содержание mBS1100
Страница 9: ......