Nova-246 Outdoor LTE Base Station Installation Guide
About This Document
This document is a guidance of Nova-246 hardware installation for installation
personnel, including the preparation of installation tools and supporting materials,
the demands for installation environment, installation procedure, cable connection
and power on.
Accomplish the installation of the device according to this guide, the installation
personnel can avoid potential damage to the device during the installation
procedure, which makes sure the subsequent good running of the device.
This document suit for the models of sBS series base stations.
Copyright Notice
Baicells copyrights this specification. No part of this specification may be reproduced in
any form or means, without the prior written consent of Baicells.
Disclaimer
This specification is preliminary and is subject to change at any time without notice.
Baicells assumes no responsibility for any errors contained herein. For more information,
please consult our technical engineers.
Disposal of Electronic and Electrical Waste
Pursuant to the WEEE EU Directive, electronic and electrical waste must not
be disposed of with unsorted waste. Please contact your local recycling
authority for disposal of this product.
Revision Record
Date
Version
Description
10 July, 2018
01
Initial Released.
15 Aug, 2018
02
Optimize the structure of the document.
15 Aug, 2018
03
Add new models.
18 Oct., 2019
04
Change LED indicators and description.
Contact Us
Baicells Technologies Co., Ltd.
Address: 3F, Hui Yuan Development Building, No.1 Shangdi Information Industry
Base, Haidian Dist., Beijing, China, 100085
E-mail:
[email protected] (Non-North America region)
[email protected] (North America region)
Website:
http://www.baicells.com/