Helvar 435 BACnet Gateway: Installation Guide
3
From the configuration pages, you can do the following:
•
Identify:
o
Each Helvar router in a defined workgroup.
o
The required Helvar router and DALI device
parameters.
o
Which BACnet Object type is assigned to each
parameter.
•
Simplify the configuration of the BACnet/IP
communication requirements and allow for connected
routers and devices to appear on the BACnet/IP BMS.
1.2.1. Front panel LEDs
The LEDs on the unit indicate the general status of the BACnet Gateway, including power, ready
and LAN communication activity.
•
Power LED
This LED shows the current status of the power applied to the unit.
‘On’ indicates that the 24 VDC power is supplied. ‘Off’ indicates that the power is not supplied
or has failed.
•
Ready LED
This LED shows the status of the boot-up
process.
‘On’ indicates that the required files have been
loaded to the RAM disk and that the unit has
successfully booted up. ‘Off’ indicates that the unit is not ready or has failed to boot up.
•
Ethernet Activity LED
This LED shows the communication between the unit and the supervisory computer or
controller connected via the Ethernet.
‘On’ indicates incoming communications traffic. ‘Off’ indicates outgoing communications
traffic.
1.2.2. Button and switches
The BACnet Gateway is fitted with a recessed button for rebooting the unit, and with a bank of four
DIP switches. The bank of DIP switches is not functional in this version.
While the reset button does not erase any configuration, we recommend that you use it only if the
software reboot fails.
DIP switches
(not used)
Reset button
Ethernet
Activity LED
Status
LEDs
Power LED
Ready LED
Содержание 435
Страница 1: ...BACnet Gateway 435 Installation Guide Doc No D007500 issue 1 2017 03 30...
Страница 4: ...iv...