Phase
2
STEP 1
5/16" [8 mm]
1/8" [3 mm]
HOLD SHEETING INSIDE OF FRAME
NOTE THRU HOLES
NOTE RIB OVERLAP
FLUSH SHEETING
NOTE THE TWO RIDGE CAP
HOLES IN EACH SHEET AND
THEIR OREINTATION
MAKE SURE YOUR ROOF PANEL IS SQUARE BEFORE MOVING ON
TO THIS STEP
.
24