background image

LIMITED CONDITIONAL WARRANTY*

Backyard Storage Solutions, LLC warrants the following:
1. 

Every product is warranted from defects in workmanship and manufacturing for 1 year.

2. 

All accessories, hardware and metal components are warranted for 2 years.

3. 

All Oriented Strand Board (OSB) is warranted for 2 years

4. 

Siding and Trim is warranted for 15 years.

5.

LP Prostruct® Flooring is warranted for 10 years

6. 

Cedar lumber is warranted for 15 years.

7. 

Preserved Pine is warranted for 10 years.

8. 

Redwood is warranted for 10 years.

9. 

Metal Roof is warranted for 25 years.

Backyard Storage Solutions, LLC will repair, replace or pay for the affected part.  In no event shall Backyard Storage Solutions, LLC 
pay the cost of labor or installation or any other costs related thereto.  All warranties are from date of purchase.  If a cash refund is paid 
on an affected part, it will be prorated from the date of purchase.

CONDITIONS

The warranty is effective only when:
1. 

The unit has been erected in accordance with the assembly instructions. 

2. 

The unit has been properly shingled and painted or stained and reasonably and regularly maintained thereafter.

3. 

The failure occurs when the unit is owned by the original purchaser.

4. 

Backyard Storage Solutions, LLC has received the warranty registration card within thirty (30) days of purchase and

 

notification of the failure in writing within the warranty period specified above.

5. 

Backyard Storage Solutions, LLC has had reasonable opportunity during the sixty (60) days following receipt of notification to

 

inspect and verify the failure prior to commencement of any repair work.

REQUIREMENTS
Storage Buildings

To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit; shingle the roof and paint or 
solid-colored stain the siding using quality, 100% acrylic latex exterior product with a minimum of two (2) coats within thirty (30) days of 
assembly; caulk above all doors and all horizontal and vertical trim boards; paint and seal all exposed edges, sides and faces of 
siding/trim and OSB siding to include all exterior walls and all sides and all edges of doors.  

Gazebos & Pergolas

To validate your warranty, it is necessary to properly maintain your Backyard Storage Solutions, LLC unit.  This includes treating all of 
the exposed cedar and pine surfaces on your gazebo or pergola structure with an exterior grade wood preservative, an exterior 
oil-based semi-transparent stain, an acrylic latex exterior paint or an acrylic latex solid color exterior stain within 30 days of assembly 
and as needed thereafter to maintain your warranty.

Keep vegetation trimmed away from building and make sure siding panels and trim do not come in contact with masonry or cement.  
The minimum ground clearance for siding must be one half inch (½ inch) from concrete slab or two and one half inches (2 ½”) from the 
ground when building is erected or constructed on a treated wood floor kit. Water from sprinklers must be kept off unit. In no event will 
Backyard Storage Solutions, LLC be responsible for any indirect, incidental, consequential or special damages nor for failure(s) that 
are caused by events, acts or omissions beyond our control including, but not limited to, misuse or improper assembly, improper 
maintenance (which eventually leads to rot or decay) and acts of God. Backyard Storage Solutions, LLC will not be held responsible for 
any labor costs incurred to construct your unit.
This warranty gives you certain specific rights that vary from state to state.

CLAIM PROCEDURE

To make a claim under this warranty, you can either call 1-888-827-9056 or email: [email protected].
 Please have ready the information below when you call or include the information in your email:
1. 

The model and size of the product.

2. 

A list of the part(s) for which the claim is made.

3. 

Proof of purchase of the Backyard Storage Solutions, LLC item, as shown on the original invoice or receipt.

4. 

Run code: found on exterior product label or assembly instructions enclosed in the product package.

All other inquiries can be mailed to:
 

Backyard Storage Solutions, LLC

 

Attn: Customer Service

 

1000 Ternes

 

Monroe, MI 48162

 *WARRANTY TERMS MAY VARY OUTSIDE THE U.S.A.

IMPORTANT:  This is your warranty certificate.

15Y PSS BB GEN LDR:  3/20/2019

Содержание SHEDMASTER HOMESTEAD

Страница 1: ...M AND MAKE UP TO 1 500 WEEK o r v i sit backyardinstaller c o m Flexible schedule No selling just building Bonus incentives available S c a n t he f lowcode to apply t o d a y INSTALLERS WANTED based...

Страница 2: ...C Puerto Rico 18 or older to participate Taxes on prize are responsibility of winner Odds of winning depend on the number of eligible reviews received Void where prohibited For complete details and of...

Страница 3: ...omer Service Team if engineered drawings are needed to pull local permits SURFACE PREPARATION To ensure proper assembly you must build your shed on a level surface Recommended methods and materials to...

Страница 4: ...on Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best surface visible...

Страница 5: ...TERIALS This shed includes a floor See the FLOOR LEVELING section on page 7 for recommended methods and suggested materials to properly level your floor as this will vary depending on your specific si...

Страница 6: ...3 8 5 1 x 10 2 x 237 2 cm FYA x2 19 32 x 3 1 2 x 71 7 8 1 5 x 8 9 x 182 6 cm JGL WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 1 x 4 3 4 x 3 1 2 1 9 x 8 9 cm 2 x 4 1 1 2 x 3 1 2 3 8 x 8 9...

Страница 7: ...x2 48 x 72 121 9 x 182 9 cm x4 46 1 8 x 72 117 2 x 182 9 cm x2 11 7 8 x 72 30 2 x 182 9 cm x2 15 7 8 x 72 40 3 x 182 9 cm x1 23 7 8 x 72 60 6 x 182 9 cm x1 LEFT DOOR x1 RIGHT DOOR FLOOR PANELS PANEL P...

Страница 8: ...2 7 6 x 217 2 cm x4 Metal Gable Drip Edge x4 LBS x4 LBS x215 2 5 1 cm x45 3 7 6 cm 3 7 6 cm 2 5 1 cm x105 1 1 2 3 8 cm x2 Transom Window x12 3 4 1 9 cm x4 x1 1 1 4 x2 Handle locking with Screws x24 2...

Страница 9: ...LEVELING MATERIALS Gravel 2x4 Treated Lumber Solid Masonry Blocks in 1 2 4 or 8 thickness Asphalt Shingles PREFERRED METHOD 4x4 TREATED RUNNERS MATERIAL REQUIRED x2 4 x 4 x 10 10 1 x 10 1 x 304 8 cm...

Страница 10: ...anchors fasteners not included Check local code for concrete foundation requirements NOTES Allow new concrete slabs to cure for at least seven 7 days Caulk Use treated lumber supplied in kit x1 A Actu...

Страница 11: ...2 3 nails at each mark and 4 3 nails at seams PARTS REQUIRED NOTE Look for Stamp FLOOR FRAME BEGIN HINT For easier nailing stand on frame x40 3 7 6 cm Nails Flush at ends Flush at ends Center on marks...

Страница 12: ...approximately 151 9 16 385 cm When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at ends of each runner Move to the opposite end of the frame Secure the...

Страница 13: ...e GAA as a spacer for consistent 3 4 measurement Secure panel with 2 nails spaced 6 apart on edges and 12 apart inside panel PARTS REQUIRED x53 2 5 1 cm FLOOR PANELS DOOR 5 8 x 48 x 96 1 6 x 121 9 x 2...

Страница 14: ...35 3 cm x1 PARTS REQUIRED 2 FLOOR PANELS DOOR 6 15 2 cm 3 4 Gauge Block 12 30 5 cm Install 23 7 8 x 92 5 8 use GAA and 44 5 8 x 96 floor panels flush to the installed panels Secure panels with 2 nails...

Страница 15: ...that the floor frame is level after installing floor panels Re level if needed HINT IMPORTANT The floor should be used as a stable work surface for wall construction Organize your assembly procedure...

Страница 16: ...cal side walls PARTS REQUIRED x40 3 7 6 cm SIDE WALLS UM x5 TJ TJ HINT For easier nailing stand on frame BEGIN 1 Orient parts on edge on floor Measure and mark Secure with 2 3 nails at each mark x10 2...

Страница 17: ...part on inside of panel Repeat steps to build your 2nd side wall SIDE WALLS 46 1 8 x 72 117 2 x 182 9 cm x2 3 4 GAUGE BLOCK Your 2 side walls are now assembled FINISH Carefully flip the wall over For...

Страница 18: ...ED x28 3 7 6 cm HINT For easier nailing stand on frame BEGIN 1 Orient parts on edge on floor Measure and mark Secure with 2 3 nails at each mark and 4 3 nails at seams UM x6 JBD TJ JBD TJ x6 2 x 4 x 6...

Страница 19: ...to frame with 2 nails spaced 6 apart along edges and 12 apart on inside of panel BACK WALL PARTS REQUIRED x122 2 5 1 cm 3 4 GAUGE BLOCK 23 7 8 x 72 60 6 x 182 9 cm x1 Flush Flush Flush 48 x 72 121 9 x...

Страница 20: ...BEGIN 1 Orient parts on edge on floor Measure and mark Secure with 2 3 nails at each mark and 4 3 nails at seam KHA KHA UM x6 GBD GSB HINT For easier nailing stand on frame Flush Flush Flush Flush Sea...

Страница 21: ...d 6 apart 2 4 3 Install temporary support OO to frame with 3 screws Install 2 11 7 8 x 72 panels flush to installed panels and flush to top of frame Secure panels with 2 nails spaced 6 apart 15 7 8 x...

Страница 22: ...e of wall panels Fig A Fig B Secure HJ with 5 2 nails spaced evenly Fig B Front wall panel HJ HJ Flush Wall Panel HJ Fig A 2 5 1 cm Nails 2 5 1 cm x5 Your front wall is now assembled FINISH Carefully...

Страница 23: ...floor with 3 nails Fig A 3 7 6 cm x8 x2 2 5 1 cm x18 RIGHT WALL INSTALLATION Center right side wall on the 96 243 8 cm floor dimension Ensure the 1 2 5 cm wall panel overlap is to the bottom Install...

Страница 24: ...cm D O O R Flush 2 5 1 cm Screw Fig B Fig A 2 5 1 cm Screw 3 3 Nail lower edge of wall panels to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig C Nail back wall panel to side wall...

Страница 25: ...m DOOR Flush Fig A 2 5 1 cm Screw 3 3 Nail lower edge of side wall panels to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig C Nail back wall panel to side wall stud with 1 1 2 nail...

Страница 26: ...Nail wall panels to side wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH 2 5 1 cm x12 1 1 2 3 8 cm x26 2 5 1 cm x4 PARTS REQUIRED Secure w...

Страница 27: ...re shed means you will have a straight and professional looking roof ALL WALLS MUST BE LEVEL PLUMB SQUARE THE FINAL DIMENSIONS WILL BE EQUAL CORNER TO CORNER Determine which corner of your shed needs...

Страница 28: ...1 BEGIN 2 Instal left and right front gable panels flush to center panel Secure parts with 1 1 2 nails evenly spaced You have finished assembling your front gable unit FINISH CKB CKB Flush Flush Flush...

Страница 29: ...1 BEGIN 2 Instal left and right front gable panels flush to center panel Secure parts with 1 1 2 nails evenly spaced You have finished assembling your back gable unit FINISH BNC BNC Flush Flush Flush...

Страница 30: ...d mark Fig A 3 7 6 cm Screws NAIL FIRST 2 5 1 cm 2 3 1 BEGIN Continue nailing lower edge of panels to gable nailer and top plate with 2 nails spaced 6 apart Working inside secure gable unit with 3 scr...

Страница 31: ...sure and mark Fig A 3 7 6 cm Screws NAIL FIRST 2 5 1 cm 2 3 1 BEGIN Continue nailing lower edge of panels to top plate with 2 nails spaced 6 apart Working inside secure gable unit with 3 screws angled...

Страница 32: ...1 4 screws spaced evenly FRONT GABLE TRIM FILLER PARTS REQUIRED DHB DHB 1 1 4 3 2 cm Screws Front gable wall shown FINISH Your front and back gable trim fillers are now installed Repeat steps to inst...

Страница 33: ...ne edge of EEB Secure parts with 1 screws in pattern shown Install soffit unit flush to top of front and back gable fillers Install the 1 8 fascia overlap toward the bottom Secure 3 8 fascia to gable...

Страница 34: ...he gable panel for position Fig A Secure 6 FYA with 3 1 2 screws FINISH Your roof purlins are now installed Repeat steps for securing purlins at both sides 3 1 2 8 9 cm x24 3 1 2 8 9 cm Screws CENTER...

Страница 35: ...panel Fig A and flush to eave wall panel Fig B Secure with 2 finishing nails spaced evenly Install eave side 69 corner trim flush to eave soffit Fig A and flush along seam of installed corner trim Fi...

Страница 36: ...h with top of gable filler Secure trim with 2 finishing nails spaced evenly as shown Your gable trim is now installed Repeat to install gable trim on opposite side Repeat to install trim panel on oppo...

Страница 37: ...om edge in line with string Referencing the center line marks on top of the gable trim secure panel to soffit trim and purlins with 3 1 1 2 screws Install screws in panel valley Fig D nearest edge Fig...

Страница 38: ...ves Fig D and flush to string Secure panel to trim EEB and roof joists FYA with 3 1 1 2 screws in panel valley nearest edge Install roof panel with 3 overlapping contour waves covering the prevoiusly...

Страница 39: ...aves and overlap the final panel by 4 contour waves Install 4 screws in each panel valley nearest edge Install 8 screws in last panel as shown Flush edge to string 3 Panel Waves 3 Panel Waves 4 Panel...

Страница 40: ...the lower 6 screws from metal panels and eave trim Fig E Beginning at the front panel tuck 5 foam enclosures in between roof panels and eave trim Reinstall screws METAL ROOF PANELS PARTS REQUIRED Clos...

Страница 41: ...each panel O indicates 1 1 2 Screws screws already installed BEGIN 1 x24 x64 7 8 22 cm 1 1 2 3 8 cm 6th Valley 3rd Valley 6th Valley 3rd Valley FRONT 21 5 16 54 1 cm 69 5 16 176 1 cm 2 5 1 cm 45 5 16...

Страница 42: ...BEGIN 1 Ridge Cap 4 x 4 x 54 10 2 x 10 2 x 137 2 cm x2 x12 7 8 2 2 cm Closure Strip 24 61 cm x10 Flush Flush Fig A Closure Strip Ridge Cap 7 8 2 2 cm Screw FINISH Your ridge cap are now installed Fig...

Страница 43: ...E PARTS REQUIRED Measure and mark 72 182 9 cm mark on 1 drip edge strip Measure and mark 52 1 4 132 7 cm on 1 drip edge strip Using a framing square scribe a 28o line from your center point cut the li...

Страница 44: ...peak of gable Position vertical edge of drip edge flush to gable trim Secure with 6 7 8 screws per side as shown FIg A Edge flush to trim 7 8 2 2 cm METAL DRIP EDGE continued PARTS REQUIRED Repeat ste...

Страница 45: ...RS 2 3 Attach temporary support OO with 3 screws in middle and at ends as shown Attach temporary support GAA with 2 1 1 4 screws as shown OFFSET 3 8 1 cm 3 8 1 cm 3 8 1 cm OFFSET GREEN RED 3 7 6 cm x4...

Страница 46: ...r doors are now installed Screw hinge boards into wall supports and floor using 10 3 screws as shown Make sure screws go into framing and floor Fig C D 6 Fig B SEAM Fig C 3 8 9 5 mm Fig D Angle 3 7 6...

Страница 47: ...pening CENTER CENTER Fig B AH 11 1 4 28 6 cm You have finished securing your door and trim FINISH BEGIN 1 2 Secure 2 horizontal door rails AH with 4 3 4 screws from behind to center of doors as shown...

Страница 48: ...rom inside edge of door Mark center of window opening on door Position window in opening flush to bottom of window opening Center window on mark Use 4 screws to secure each window 2 Apply high quality...

Страница 49: ...D THESE DIMENSIONS BEGIN Center OO vertically on the left door in the doorway Fig A overlapping 1 2 5 cm along the edge of door Fig B Secure with 7 2 screws through outside trim into OO 1 Center OO ve...

Страница 50: ...ith 1 4 drill 1 3 4 4 4 cm 1 4 Pre drill and 1 2 Drill through Fig A 1 2 13 mm Drill Bit 1 4 6 mm Drill Bit 3 4 1 9 cm x12 Install decorative hinges on horizontal trim and flush against hinge 3 1 3 4...

Страница 51: ...cting base Fig B Mark and pre drill holes for screws Install bolt with screws supplied Drill 5 16 7 9 mm hole deep enough for bolt to slide into Your spring bolts are now installed FINISH BEGIN 1 PART...

Страница 52: ...cure with 1 1 2 screws 2 1 3 4 3 8 cm 35 3 4 90 cm RIGHT DOOR DOOR HARDWARE DECORATIVE HINGES x1 3 4 1 9 cm x12 x4 x2 PARTS REQUIRED 1 1 2 3 8 cm Re drill hole with 1 2 drill Keep drilled hole square...

Страница 53: ...e panel Fig A Secure with 2 finishing nails spaced evenly Install 6 eave side 69 battens flush to eave soffit Fig A Measure and mark centers of battens from corner trim Middle batten covers the seam S...

Страница 54: ...and back walls as shown 1 at top and 1 at bottom Cut out marked openings Caulk behind vent flanges Secure with 1 2 screws 1 Your vents are now installed FINISH 16 x 8 x2 1 2 13 mm x12 6 15 2 cm 3 5 7...

Страница 55: ...7 1 4 X 48 RGT BCK K 48002704100 1 Back Wing Gable Panels 3 8 NG 27 1 4 X 48 LFT BCK K 48002704200 1 Front Back Corner Trim 3 8 NG 1 3 4 X 70 1 2 K 70080112000 6 Side Corner Trim Batten 3 8 NG 1 3 4 X...

Страница 56: ...siding trim and OSB siding to include all exterior walls and all sides and all edges of doors Gazebos Pergolas To validate your warranty it is necessary to properly maintain your Backyard Storage Solu...

Отзывы: