64
Your door stiffeners are now installed.
Center each
OO
vertically on the inside of door between the floor and door header
(Fig. C)
and flush to edge of door
(Fig. D)
.
From outside, secure
OO
with (7) 2" screws through trim into
OO
(Fig. D)
.
Space screws evenly.
FINISH
2
Fig. C
Center OO
vertically
PARTS REQUIRED:
DOOR STIFFENERS
2"
(5,1 cm)
Screws
x14
11" (27,9 c
m)
Approximat
ely
x14
2" (5,1 cm)
OO
x2
1-1/4" x 2-1/2" x 69" (3,2 x 6,3 x 175,3 cm)
OO (2)
Weatherstrip
OO
Flush
2"
(5,1 cm)
Screws
Fig. D
INSIDE OF
DOOR
Install OO on left door over
top of weatherstrip.
Содержание MODERN 12 x 6
Страница 2: ...This page intentionally left blank...