manualshive.com logo in svg
background image

8

Rack for Squareness

Racking a Roof

When building walls, always apply panel at far left  rst.  Position 
panel  ush with top of wall frame and nail in upper corners as 
shown.  Rack wall square by moving lower end of wall panel right or 
left until panel is  ush with framing along left edge and secure with 
one nail in each lower corner. Continue nailing as instructed.

Alineando un techo

Racking a Wall

Alineando un Muro

Y O U   M A Y   N E E D   T O   R A C K   Y O U R   W A L L 
P A N E L S   A N D   R O O F   P A N E L S   T O   E N S U R E 
S Q U A R E N E S S   B E F O R E   C O M P L E T E L Y 
N A I L I N G 

Position panel  ush with outside front edge of rafter and nail in two cor-
ners as shown. Rack panel square by moving opposite end up or down 
until panel is  ush along peak of rafters and secure with one nail in each 
corner. Ensure spacing of center rafters and nail as instructed.

Posicione los paneles nivelados con el borde delantero exterior de la viga y 
clave en las dos esquinas como en el dibujo.  Alinee escuadra el panel por 
mover los extremos opuestos arriba o abajo hasta que el panel esté nivelado a 
lo largo del punto más alto de las vigas, y fíjelo con un clavo en cada esquina.  
Compruebe el espacio de las vigas centrales y clave como indicado.

I M P O R T A N T ! ! !

B u i l d i n g   T i p

ES PRECISO ALINEAR LOS PANELES DE LOS 
MUROS Y DEL TECHO ANTES DE CLAVARLOS 
COMPLETAMENTE PARA ASEGURAR LA ES-
CUADRA.

Flush

Nivelado

Nail

Clavo

Nivele para escuadrar

I M P O R T A N T E ! ! !

C o n s e j o

Al construir los muros, siempre  je primero el panel hasta la izquierda 
extrema.  Posicione el panel nivelado con la parte superior de la es-
tructura del muro y clávelo en la esquina superior como en el dibujo.  
Alinee nivelado el muro por mover el lado inferior a la derecha o a la 
izquierda hasta que el panel esté nivelado con la estructura a lo largo 
del borde izquierda.  Fije con un clavo en cada esquina inferior.

A

B

Top Corner Should Be Flush

La esquina superior debe 

estar nivelado con la es-

tructura

Flush

Nivelado

Flush

Nivelado

Nail

Clavo

Nail

Clavo

Flush with Rafter Peak

Nivelado con la parte más 

alta de las vigas.

Содержание Heritage Series

Страница 1: ...OVIDE ASSISTANCE PRIL THROUGH CTOBER TO 0 34 3ATURDAY TO 0 34 OVEMBER THROUGH ARCH TO 0 34 4 3 6 6 2 _ 3 3I DESEA M S INFORMACI N SOBRE EL MONTAJE LL MENOS SIN COSTE ADICIONAL ALGUNO AL SIGUIENTE TEL...

Страница 2: ...4HIS PAGE INTENTIONALLY LEFT BLANK STA P GINA EST INTENCIONADO EN BLANCO...

Страница 3: ...ructions thoroughly before you begin Building Codes Our buildings are designed to meet most local and national U S codes and are not meant to be used for living space General construction drawings can...

Страница 4: ...or ROOF GABLE TRIM DOOR W Puerta izquierda Puerta derecha x2 C x2 x23 SP UM 3 8 x23 7 8 x72 9x61x183 cm 2 x4 x48 5x10x122 cm 2x4x94 1 2 240 cm 2x4x92 1 2 235 cm UN TJ x2 2x4x24 61 cm 7 16 x23 x48 1 1x...

Страница 5: ...4x60 Dimensiones Verdadera 5x10x173 cm 5x10x122 cm 2x6x48 5x15x122 cm 7 16 x23 x48 1 1x58x122 cm K x1 Viga Rafter x2 QG QF 2 5X10X152 cm ZT x2 5 8 x4 x48 1 6x10x122 cm 3 8 x9 3 16 x47 7 8 0 95x23x122...

Страница 6: ...LOS MATERIALES ANTES DE EMPEZAR A MONTAR SU EDIFICIO Wood is a natural product that has inherent blemishes All interi or framing is graded for structural strength and not appearance Exterior trim is...

Страница 7: ...DEL SITIO El sitio debe de estar nivelado correctamente Instale una barrera contra yerbajos debajo de la estructura Important Square oor and level to ground before beginning assembly of building Impo...

Страница 8: ...erta y construya el muro con la puerta primero WALL NUMBER EQUALS PAGE NUMBER BUILD WALL NUMBERS SPECIFIED EL NUMERO DEL MURO CORRESPONDE AL NUMERO DE LA PAGINA CONSTRUYA LOS N MEROS DE LOS MUROS ESPE...

Страница 9: ...OS Y DEL TECHO ANTES DE CLAVARLOS COMPLETAMENTE PARA ASEGURAR LA ESCUADRA Asegure que se construyan los muros como en los dibujos abajo CONSTRUYA EL MURO CON PUERTA PRIMERO Make sure all walls are bui...

Страница 10: ...mo en el dibujo Alinee escuadra el panel por mover los extremos opuestos arriba o abajo hasta que el panel est nivelado a lo largo del punto m s alto de las vigas y f jelo con un clavo en cada esquina...

Страница 11: ...Vista terminal 24 61 cm 92 1 2 235 cm 71 180 cm UM x5 24 61 cm 24 61 cm 20 1 2 52 cm TJ x2 3 7 6 cm 2 5 cm A x2 96 244 cm 3 1 2 8 9 cm 1 2 5 cm 6 15 cm 12 30 cm Top Parte Superior See Page 8 For Build...

Страница 12: ...71 180 cm UM x6 24 61 cm 16 41 cm 16 41 cm 20 1 2 52 cm TJ x2 SP x2 End View Vista terminal End View Vista terminal 140 1 2 357 cm 144 366 cm 3 1 2 8 9 cm 92 1 2 235 cm 48 122 cm 64 163 cm 20 1 2 52...

Страница 13: ...Parte Superior Top Parte Superior See Page 8 For Building Tip End View Vista terminal End View Vista terminal Flush Nivelado Ver la p gina 8 para un consejo 16 41 cm 64 163 cm 140 1 2 357 cm 24 61 cm...

Страница 14: ...ta terminal End View Vista terminal 71 180 cm UM x6 140 1 2 357 cm 24 61 cm 24 61 cm 16 41 cm TJ x2 SP x2 12 1 2 32 cm 64 163 cm 144 366 cm 6 15 cm 3 1 2 8 9 cm 1 2 5 cm B C B 144 366 cm 140 1 2 357 c...

Страница 15: ...nsejo Algunas con guraciones utilizar n 2 paneles C aqui Some con gurations will utilize 2 C panels here WALL 13 x 32 MURO 13 3 7 6 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 20 1 2 52 cm 92 1 2...

Страница 16: ...1 2 479 cm 24 61 cm 24 61 cm 16 41 cm 64 163 cm 16 41 cm 24 61 cm 20 1 2 52 cm Top Parte Superior End View Vista terminal End View Vista terminal B x4 192 488 cm C C B 6 15 cm 3 1 2 8 9 cm 1 2 5 cm 1...

Страница 17: ...rminal End View Vista terminal SP x2 SP x2 UM x8 188 1 2 479 cm 12 1 2 32 cm 71 180 cm 64 163 cm 16 41 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm TJ x2 192 488 cm 6 15 cm 3 1 2 8 9 cm 1 2 5 cm C B C C B 1...

Страница 18: ...2 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 16 41 cm 71 180 cm 192 488 cm 6 15 cm 3 1 2 8 9 cm 1 2 5 cm B B C C C C Top Parte Superior End View Vista terminal 188 1 2 479 cm 64 163 cm 24 61 cm 16 61 cm 2...

Страница 19: ...479 cm 3 1 2 8 9 cm 188 1 2 479 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 24 61 cm 20 1 2 52 cm Top Parte Superior Top Parte Superior See Page 8 For Building Tip Ver la p gina 8 para un...

Страница 20: ...m 2 5 cm x 18 Wall Muro 11 ERECTING WALLS See Page 7 for Building Tip Ver la p gina 7 para un consejo Ver la p gina 7 para un consejo 3 7 6 cm 3 7 6 cm 3 7 6 cm 3 7 6 cm 3 7 6 cm 12 30 cm 2 5 cm 2 5 c...

Страница 21: ...la p gina 7 para un consejo ERECTING WALLS CONSTRUYENDO LOS MUROS 3 7 6 cm 12 30 cm 2 5 cm 12 30 cm 2 5 cm See Page 6 for wall Ver la p gina 6 para muro Nivele la pared y clave Level Wall and Nail Re...

Страница 22: ...S 8 X 16 244 x 488 cm x 56 8 x12 244 x 366 cm x 68 8 x16 244 x 488 cm 3 7 6 cm 1 5 8 4 13cm 1 5 8 4 13 cm 100 254 cm VF UN UN VK VF VF VF VK 1 5 8 4 13 cm 1 5 8 4 13 cm 100 254 cm VK UN VF VK UN VF IN...

Страница 23: ...OOF x 40 End Rafter Assembly x2 TECHO Conjunto de vigas terminales x2 1 1 2 3 8 cm x 24 x1 x1 109 1 4 277 cm Q QF QG Flush Nivelado Q Glue Pegamento 109 1 4 277 cm Q Flush Nivelado Q Glue Pegamento QF...

Страница 24: ...ddle Rafter Assembly See sizes below for quantity Conjunto de vigas centrales Ver las dimensiones abajo para la cantidad x 8 109 1 4 277 cm QG QF Flush Nivelado Q Glue Pegamento Glue Pegamento 2 5 cm...

Страница 25: ...s dimensiones 3 7 6 cm x36 8 x12 244 x 366 cm Shown Indicado End Rafters have one gusset to the inside Las vigas terminales tienen una placa de uni n 3 7 6 cm x48 24 61cm 24 61cm 24 61cm 24 61cm 24 61...

Страница 26: ...ROOF x 40 TECHO 8 x16 244 x 488 cm x112 x160 2 5 cm See Page 8 for Building Tip 8 x12 244 x 366 cm Shown Indicado Ver la p gina 8 para un consejo F E M G F E J I M G E F L H E F L H K J 24...

Страница 27: ...ROOF x 40 TECHO Gable Panels Paneles del techo a dos aguas x 76 1 1 2 3 8 cm x2 1 3 4 4 4cm 1 3 4 4 4cm 7 17 5cm 1 1 2 3 8cm 8 20cm RL RL R R R S S S 25...

Страница 28: ...TRIM x 40 MOLDURA x 21 2 5 cm ZP ZJR ZKL YX T YX ZKR YX ZP T N N O TRIM x 40 MOLDURA x 66 2 5 cm 26...

Страница 29: ...8 x16 244 x 488 cm x 40 8 x12 244 x 366 cm Shown Indicado 2 5 cm TRIM MOLDURA x 28 ZP x4 ZP x4 ZT x2 27...

Страница 30: ...ted sill on concrete slab if desired Place a center mark for door location Ponga un se al en el centro para la puerta Corte la placa inferior en la abertura de la puerta Deje la solera tratada en la l...

Страница 31: ...las puertas abren bien y clave Attach with 3 7 6 cm Screws rst check doors to open properly and nail x 48 2 5 cm TRIM MOLDURA Inside Building Interior del edi cio 12 30 cm ZJ ZJ ZJ ZO x 4 ZO ZO x4 ZJ...

Страница 32: ...DOOR PUERTA DOOR PUERTA Plain Diamond Traditional X Contemporary Double X Outer Diamond Inner Diamond 3 4 1 9 cm x 32 30 ZWL ZWL ZWR ZWR Y x 8 ZWR x 2 ZWL x 2...

Страница 33: ...terior Moldura Visi n Interior DOOR PUERTA 2 5 cm x 12 UP x 2 Existing Door Top View Attaching Door Stiffiner Puerta Existente Visi n De arriba Atadura del apoyo de la puerta 2 screw Outside Al aire l...

Страница 34: ...DOOR PUERTA 1 2 5 cm x 34 Flush Al ras Flush Al ras DWS DEL DEL Flush Al ras 32...

Страница 35: ...cm 1 3 4 4 4cm 35 3 4 91cm If installing optional 3 point lock refer to the next 2 pages If not skip to page 40 Si instalando opcional 3 cerradura del punto se re ere a las pr ximas 2 p ginas Si no s...

Страница 36: ...OPTIONAL 3 POINT LOCKING MECHANISM OPCIONAL See next page for mounting location of brackets and plates Vea pr xima p gina para montar par ntesis 34...

Страница 37: ...u a para ayudar plato seguro al suelo 1 Locate exact plate position and mark guide hole 2 Drill a 3 8 hole 2 1 2 deep going into the header 3 Fasten plate with the screws and washers provided 2a Drill...

Страница 38: ...o centrado en moldura Z x2 HOOK AND EYE AND BARREL BOLT x 2 x 2 Hooks and eyes should go into a trim or stud Hay que fijar los corchetes a la moldura o un montante NOTE Install hook and eye into trim...

Страница 39: ...ntable Caulk at all horizontal and vertical seams between the Trim and Walls and all around the Door Trim Use a high quality exterior acrylic latex paint When painting your building there are a few ke...

Страница 40: ...velado al gotero Okay if Shingle Overlaps Est bien si la teja sobresale Line up notch on top of Shingle with edge of Roof to stagger the Shingles Alinee el corte encima de la teja con el borde del tec...

Страница 41: ...lientes hinque cla vos sobresalientes en la madera or c rtelos nivela dos con la madera Keep grass trimmed and away from building Corte y quite la hierba cerca del edi cio Keep Sprinklers away from bu...

Страница 42: ...tain the siding using 100 acrylic latex exterior product with a minimum of two 2 coats within sixty 60 days of installation caulk above all doors and all horizontal and vertical trim boards paint and...

Страница 43: ...exteriores con un m nimo de dos 2 capas dentro de los sesenta 60 d as de la instalaci n masillar sobre todas las puertas y todas las molduras horizontales y verticales pintar y sellar todos los bordes...

Отзывы: