71
PARTS REQUIRED:
DOUBLE DOOR HARDWARE
x2
3/8" BIT
(9,5 mm)
x8
1-1/4 (3,2 cm)
FINISH
Flush and center top spring bolt at the top of
OO (Fig. A)
. Secure with (4) 1-1/4" screws.
Mark spring bolt pin location on over door frame. Drill a 1-1/2" deep hole using a 3/8" drill bit.
2
BEGIN
¸
1
LEFT
DOOR
Fig. B
Your spring bolts are now installed.
Fig. A
Flush
Flush
69" (175,3 cm)
Door Stiffener
69" (175,3 cm)
Door Stiffener
3/8" drill for bolt:
1-1/2" deep.
3/8" drill for bolt:
1-1/2" deep.
OVER DOOR FRAME
FLOOR
OO
OO
x4
x4
CENTER
CENTER
Flush and center bottom spring bolt to bottom of
OO (Fig. B)
. Secure with (4) 1-1/4" screws.
Mark spring bolt pin location on floor.
Drill a 1-1/2" deep hole using a 3/8" drill bit.
1-1/4 (3,2 cm)
1-1/4 (3,2 cm)
Содержание Heartland CLASSIC GENTRY GABLE 12' x 12'
Страница 2: ...This page intentionally left blank...