background image

16432

Call Us First!

DO NOT RETURN TO STORE.

For immediate help with assembly or product information

call our toll free number:

1-888-827-9056

or email:

[email protected]

Our staff is ready to provide assistance

April through October M-F 8:00 AM to 7:00 PM EST

Saturday 8:30 AM to 4:30 PM EST

November through March M - F 8:00 AM to 5:00 PM EST

STOP!

STOP!

PART 1

Содержание GAMBREL 12' x 12'

Страница 1: ...formation call our toll free number 1 888 827 9056 or email customerservice backyardproductsllc com Our staff is ready to provide assistance April through October M F 8 00 AM to 7 00 PM EST Saturday 8...

Страница 2: ...This page intentionally left blank...

Страница 3: ...to level your shed are listed on page 10 CHECK ALL PARTS Inventory all parts listed on pages 5 8 ADDITIONAL MATERIALS You will need additional materials to complete your shed See pages 3 4 for require...

Страница 4: ...ly or installation Level Gloves Framing lumber is graded for structural strength and not appearance Exterior trim is graded for one good side Always install the material leaving the best edge and best...

Страница 5: ...x 4 x 12 5 1 x 10 2 x 304 8 cm Treated Lumber cut to 2 x 4 x 117 5 1 x 10 2 x 297 2 cm 3 7 6 cm hot dipped galvanized nails 2 x 4 x 12 5 1 x 10 2 x 304 8 cm Treated Lumber cut to 2 x 4 x 117 5 1 x 10...

Страница 6: ...Drip Edge Feet 15 Roofing Felt Sq ft to cover 1 Galvanized Roofing Nails lbs For roofing felt 2 5 1 cm 2 5 1 cm 2 5 1 cm 2 5 1 cm x2 x2 x2 x3 1 lb of 2 5 1 cm Hot Dipped Galvanized Box Type Nails 1 l...

Страница 7: ...t stamp WOOD SIZE CONVERSION CHART Nominal Board Size Actual Size 1 x 4 3 4 x 3 1 2 1 9 x 8 9 cm 2 x 4 1 1 2 x 3 1 2 3 8 x 8 9 cm 2 x 3 1 1 2 x 2 1 2 3 8 x 6 3 cm 1 x 3 3 4 x 2 1 2 3 8 x 6 3 cm RS RS...

Страница 8: ...m x12 FASTENER HARDWARE BAG Shown Actual Size PANEL DOORS PARTS LIST x1 x1 ROOF PANELS NOTE If you are using a nail gun nails may be used where screws are shown for quicker assembly Length of nail mus...

Страница 9: ...2 1 5 x 6 3 x 182 9 cm OO x2 69 175 3 cm Door Stiffener MDL x2 19 32 x 2 1 2 x 39 7 8 1 5 x 6 3 x 101 3 cm AH x2 19 32 x 2 1 2 x 26 5 8 1 5 x 6 3 x 67 7 cm DOOR HARDWARE 3 4 1 9 cm x8 x2 x1 x2 x2 1 2...

Страница 10: ...10 2 x 121 9 cm SX x2 2 x 4 x 60 5 1 x 10 2 x 121 9 cm SX x4 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x6 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x4 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI x8 x4 x8 2 x 4 x...

Страница 11: ...7 cm 12 x20 304 8 x 609 6 cm 12 x24 304 8 x 731 5 cm 144 365 8 cm 203 5 8 612 3 cm 192 487 7 cm 240 609 6 cm 288 619 8 cm 240 609 6 cm 279 7 8 710 6 cm 322 817 9 cm 12 x 12 Building Requires 12 x 16 B...

Страница 12: ...METHODS MATERIAL REQUIRED TREATED LUMBER 4 x 4 x 12 10 2 x 10 2 x 304 8 cm 3 4 x 4 x 16 10 2 x 10 2 x 487 7 cm and 3 4 x 4 x 16 10 2 x 10 2 x 487 7 cm and 1 4 x 4 x 12 10 2 x 10 2 x 144 cm cut to 3 4...

Страница 13: ...r at ends of each runner At the opposite end of the frame secure the frame to 4x4 runners with one fastener at the ends of each runner ensuring that the frame remains square Fasten the frame to the 4x...

Страница 14: ...ure during the build process to avoid over handling of the walls HINT D O O R NOTE 12 x 12 Gambrel shown standard throughout manual Ensure the floor frame is level after installing floor panels Re lev...

Страница 15: ...13 This page intentionally left blank...

Страница 16: ...ing pages 01 01 02 01 01 02 03 03 02 02 03 02 02 02 03 02 02 02 02 02 02 02 02 02 02 02 02 02 02 02 04 07 10 12 16 13 17 14 18 15 19 09 11 05 06 04 07 07 12 16 12 16 12 16 12 16 08 08 04 04 V 1 V 2 V...

Страница 17: ...2 walls 12 12 x 24 Door is on the 12 wall Wall 01 Page 18 Wall 02 Page 20 Wall 16 Page 48 build 2 walls 16 12 x 16 V 2 Door is on the 16 wall offset right Wall 02 Page 20 Wall 07 Page 30 Wall 10 Page...

Страница 18: ...1 AM and OSB end to end on flat surface flush in middle Center OSB on top of AM Fasten together with 3 nails in the pattern shown Your door header is now assembled FINISH OSB ASSEMBLED END VIEW BEGIN...

Страница 19: ...posite end Using the long edge of the panel as a lever move the panel side to side until you have a 3 4 measurement on the wall stud Secure corner with 2 2 nails Fig B 3 4 Gauge Block x1 3 8 x 48 x 84...

Страница 20: ...2 x 199 4 cm AI TP UM UM TP SP SP AI x6 AL x5 Flush Flush Flush Flush Flush Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header...

Страница 21: ...x166 x1 x1 6 15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw 3 4 1 9 cm x1 69 75 3 cm Door Stiffener OO Temporary B...

Страница 22: ...cm PARTS REQUIRED x32 x7 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI AI x7 SP TP SP TP 1 BEGIN Orient parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each conn...

Страница 23: ...all 48 x 84 panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orienta...

Страница 24: ...cm PARTS REQUIRED x32 x7 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI AI x7 SP TP SP TP 1 BEGIN Orient parts on edge on floor as shown Measure and mark from end of boards Secure with 2 3 nails at each conn...

Страница 25: ...from the top plate Use a 2x3 spacer for consistent measurement Secure panel with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 1 48 x 8...

Страница 26: ...1 x 10 2 x 235 cm TJ x1 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC PARTS REQUIRED YFA HVC TJ AI x5 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each...

Страница 27: ...and 12 inside panel Note the panel lip edge square edge orientation 2 Install next 2 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart...

Страница 28: ...sembled Header x5 2 x 4 x 7 5 1 x 10 2 x 17 8 cm AL x4 2 x 4 x 78 1 2 5 1 x 10 2 x 199 4 cm AI TJ UM UM HVC YFA YFA AI x4 AL x5 Flush Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measur...

Страница 29: ...15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 11 7 8 x 8...

Страница 30: ...Assembled Header TJ UM UM HVC YFA YFA AI x4 AL x5 Flush Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header as shown Fig A Secur...

Страница 31: ...LL 06 WITH DOOR 2 5 1 cm x129 x1 x1 6 15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener O...

Страница 32: ...nt parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 16 EAVE WALL 07 3 7 6 cm x72 PARTS REQUIRED AI x7 TJ SP SP YFA YFA HVC Sea...

Страница 33: ...with 2 nails spaced 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 3 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Sec...

Страница 34: ...nt parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 16 EAVE WALL 08 3 7 6 cm x36 PARTS REQUIRED AI x7 TJ SP SP YFA YFA HVC Sea...

Страница 35: ...panel Note the panel lip edge square edge orientation 2 Install 2 48 x 84 and 2 23 7 8 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails spaced 6 apart o...

Страница 36: ...Assembled Header TJ SP UM UM HVC YFA YFA SP AI x6 AL x5 Flush Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header as shown...

Страница 37: ...1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 48 x 84 panel flush...

Страница 38: ...Header TJ UM UM HVC YFA YFA SP AI x6 AL x5 Flush Seam Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header as shown Fig...

Страница 39: ...orary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 23 7 8 x 84 and 1 48 x 84 panels flush to installed panels and 1 1 2 fro...

Страница 40: ...embled Header TJ SP UM UM HVC YFA SP YFA AI x6 AL x5 Flush Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Header as show...

Страница 41: ...1 6 15 2 cm 1 1 2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 48 x 8...

Страница 42: ...HINT 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 20 EAVE WALL 12 3 7 6 cm x44 PARTS REQUIRED AI x9 TJ TP T...

Страница 43: ...d 6 apart on edges and 12 inside panel Note the panel lip edge square edge orientation 2 Install 4 48 x 84 panels flush to installed panels Locate panels 1 1 2 from the top plate Secure with 2 nails s...

Страница 44: ...x1 Pre Assembled Header TJ TP UM UM HVC YFA YFA TP AI x8 AL x5 Flush Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Hea...

Страница 45: ...h OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 2 48 x 84 panel flush to installed panels and 1 1 2 from the top...

Страница 46: ...1 Pre Assembled Header TJ TP UM UM HVC YFA TP YFA AI x8 AL x5 Flush Seam Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled...

Страница 47: ...2 3 8 cm BEGIN HERE 3 4 1 9 cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 3 48 x 84 panel flush t...

Страница 48: ...x1 Pre Assembled Header TJ TP UM UM HVC YFA TP YFA AI x8 AL x5 Flush Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient Pre Assembled Hea...

Страница 49: ...cm Flush Flush OO Temporary Brace 3 7 6 cm x2 4 3 64 162 6 cm 3 7 6 cm Screw 3 7 6 cm Screw x1 69 75 3 cm Door Stiffener OO Temporary Brace Install 3 48 x 84 panel flush to installed panels and 1 1 2...

Страница 50: ...HINT 1 BEGIN Orient parts on edge on floor Measure and mark from end of boards Secure with 2 3 nails at each connection and 4 3 nails at seams 24 EAVE WALL 16 3 7 6 cm x56 PARTS REQUIRED AI x11 SP TP...

Страница 51: ...sh Flush Flush SQUARE EDGE SQUARE EDGE SQUARE EDGE SQUARE EDGE SQUARE EDGE 1 1 2 3 8 cm 3 1 2 8 9 cm Install 1 48 x 84 panel 1 1 2 from the top plate Use a 2x3 spacer for consistent measurement Secure...

Страница 52: ...6 x1 Pre Assembled Header TJ TP SP UM UM HVC SP YFA TP YFA AI x10 AL x5 Flush Seam Seam Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient...

Страница 53: ...r Stiffener OO Temporary Brace Install 2 48 x 84 panel flush to installed panels and 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip e...

Страница 54: ...6 x1 Pre Assembled Header TJ TP SP UM UM HVC SP YFA TP YFA AI x10 AL x5 Flush Seam Seam Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Orient...

Страница 55: ...8 x 84 panel flush to installed panels and 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip edge square edge orientation Flush Flush Fl...

Страница 56: ...x1 Pre Assembled Header TJ TP SP UM UM HVC SP TP YFA YFA AI x10 AL x5 Flush Seam Seam Seam Seam Seam Seam 3 7 6 cm Screws Orient parts on edge on floor as shown Measure and mark from end of boards Ori...

Страница 57: ...r Stiffener OO Temporary Brace Install 2 48 x 84 panel flush to installed panels and 1 1 2 from the top plate Secure with 2 nails spaced 6 apart on edges and 12 apart inside panel Note the panel lip e...

Страница 58: ...mension 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to...

Страница 59: ...nd top plate Fig B Secure wall to bottom plate first 1 ENSURE PANEL CORNERS ARE FLUSH Your 12 eave wall 04 is now installed FINISH 2 5 1 cm x27 1 1 2 3 8 cm x13 2 5 1 cm x2 PARTS REQUIRED 1 1 2 3 8 cm...

Страница 60: ...or frame with 2 nails spaced 6 apart Angle nails into floor frame Fig C Secure wall bottom plates to floor with 3 nails Fig C 1 1 2 3 8 cm Nails 6 15 2 cm 3 7 6 cm Screw Fig D 6 15 2 cm Secure wall wi...

Страница 61: ...ail panels to 24 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING...

Страница 62: ...SP x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x2 2 x 4 x 96 5 1 x 10 2 x 243 8 cm PT DOOR Ensure all doubler seams are non aligned over seams of wall top plates HVC TJ TJ SP PT SP PT 3 7 6 cm Nails...

Страница 63: ...sion 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to fl...

Страница 64: ...to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig C Nail panel to 12 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 1st 16 eave wall 07 is now instal...

Страница 65: ...lace 2nd 16 wall centered on floor The 1 1 2 3 8 cm overlap is to the top Use TJ as a temporary brace as shown Secure TJ with 2 3 screws TJ x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ Temporary Brace 1 1...

Страница 66: ...Nail 16 wall panel to 12 wall stud with 1 1 2 nails spaced 6 apart Your 2nd 16 07 or 08 wall is now installed FINISH 1 1 2 3 8 cm x13 Secure gable wall top plate with 1 3 screw at the corner at an an...

Страница 67: ...4 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING 2 5 1 cm x16 1...

Страница 68: ...every 24 Fig A 2 Secure from bottom with 2 3 screws at each corner Fig B Fig B 3 7 6 cm Screws Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ 2 x 4 x 48 5 1 x 10 2 x 121 9 cm NK x2 2 x 4 x 44 3 8 5 1...

Страница 69: ...sion 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to fl...

Страница 70: ...to floor with 2 nails spaced 6 apart Angle nails into floor frame Fig C Secure panel to 12 wall stud with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your 1st 20 eave wall 12 is now ins...

Страница 71: ...floor 1 1 2 3 8 cm overlap is to the top Use TJ as a temporary brace as shown Secure TJ with 2 3 screws TJ 3 7 6 cm Screws 3 7 6 cm x2 x1 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ Temporary Brace 1 1 2 3...

Страница 72: ...4 Secure 20 wall panel to 12 wall stud with 1 1 2 nails spaced 6 apart Your 2nd 20 wall 12 is now installed FINISH 1 1 2 3 8 cm x13 Secure wall top plate with 1 3 screw at the corner at an angle as s...

Страница 73: ...4 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING 2 5 1 cm x16 1...

Страница 74: ...spaced every 24 Fig A Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ 2 x 4 x 48 5 1 x 10 2 x 121 9 cm SP x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm PT DOOR Ensure...

Страница 75: ...sion 1 1 2 3 8 cm overlap is to the top OO BEGIN 1 1 1 2 3 8 cm Secure lower edge of panel to floor frame with 2 nails spaced 6 apart Angle nails into floor frame Fig A Secure wall bottom plates to fl...

Страница 76: ...2 3 screws Secure wall with 1 2 screw into 12 wall bottom plate Fig A and top plate Fig B Secure wall to bottom plate first BEGIN 1 ENSURE PANEL CORNERS ARE FLUSH Your 1st 24 eave wall 16 is now inst...

Страница 77: ...oor The 1 1 2 3 8 cm overlap is to the top Use TJ as a temporary brace as shown Secure TJ with 2 3 screws TJ 3 7 6 cm Screws 3 7 6 cm x4 x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ Temporary Brace 1 1 2...

Страница 78: ...4 Secure 24 wall panel to 12 wall stud with 1 1 2 nails spaced 6 apart Your 2nd 24 wall 16 is now installed FINISH 1 1 2 3 8 cm x13 Secure wall top plate with 1 3 screw at the corner at an angle as s...

Страница 79: ...4 wall studs with 1 1 2 nails spaced 6 apart ENSURE PANEL CORNERS ARE FLUSH Your walls are now installed FINISH CUT OUT AND REMOVE BOTTOM PLATE AT DOOR OPENING REMOVE TEMPORARY BRACING 2 5 1 cm x16 1...

Страница 80: ...from top with 2 3 nails spaced every 24 Fig A x2 2 x 4 x 92 5 8 5 1 x 10 2 x 235 cm TJ x2 2 x 4 x 44 3 8 5 1 x 10 2 x 112 7 cm HVC x4 2 x 4 x 96 5 1 x 10 2 x 243 8 cm PT Ensure all doubler seams are n...

Страница 81: ...79 Please continue to the included booklet to complete your shed PART 2...

Отзывы: