55
RAFTERS
ROOF
GABLE TRIM
ROOF
Flush
2. Attach 2740-ST rafters to roof rail as shown.
3. Ensure 2740-ST rafter ends are Flush with angle of roof rail.
1. Select 2740-ST from GROUP H (wood parts pages).
3. Secure 2740-ST with wood screws. Ensure peaks are
Á
ush.
3" Wood Screws
x4
Flat Washer
Lock Washer
2" Hex Bolt
x4
T-Nut
x4
Flush
Flush
Flush
x4
2740-ST
1 x 3-1/2 x 57-3/4"
KEEP DRILL STRAIGHT
Flush
2. Attach 2512-ST gable trim to rafters as shown.
1. Select 2512-ST from GROUP H (wood parts pages).
3. Secure 2512-ST with wood screws. Ensure LEVEL and
Á
ush at ends.
1-5/8" Wood Screws
x8
x2
2512-ST
5/8 x 3-1/4 x 35-3/4"
LEV
EL
Flush
Flush
Flush
Flush
Do not over-tighten screws. Keep screw heads
Á
ush with top of board.
PRE DRILL 1/8" x1-1/2" deep pilot
hole before installing screws.