![Backyard Play Systems 4030 Скачать руководство пользователя страница 31](http://html1.mh-extra.com/html/backyard-play-systems/4030/4030_manual_3344192031.webp)
29
LAY OUT PARTS - ROCK LOCATIONS
After markin
g
Rock po
s
ition
s
, remove Rock
s
and drill 1/4” hole
s
throu
g
h Rock Wall Deck Board
s
u
s
in
g
the marked hole location
s
.
ROCK WALL
ROCK WALL
INSTALL T-NUTS
Turn all eleven P1 panel
s
over (lay on a
s
oft but firm
s
urface).
Pound in 1/4” T-Nut
s
(Included in Climbin
g
Rock Ba
g
) at each hole location
1/4
”
T-Nut x26
ROCK
HARDWARE
BAG
Содержание 4030
Страница 2: ...This page intentionally left blank...
Страница 4: ...This page intentionally left blank...