SLIDE ATTACHMENT
STEP 2
USING SLIDE HOLES AS A GUIDE,
PRE-DRILL 3/8" DIAMETER HOLES
THROUGH FLOOR IN THE OUTSIDE
(2) LOCATIONS ONLY.
QU - SLIDE VF 10 FT - A100287
(1)
SLIDE VF 10 FT
(1 PLC)
T-NUT 5/16
(2 PLCS)
BOLT WH 5/16x1 1/4
(2 PLCS)
LAG SCREW WH 5/16x1 1/2
(1 PLC)
LAG SCREW
WH 5/16x1 1/2
(1)
BOLT WH
5/16x1 1/4
(2)
T-NUT 5/16
(2)
Содержание WOODLAND 6014
Страница 91: ...FORT ASSEMBLY STEP 53 REPEAT STEPS 51 AND 52 TO ATTACH ROOF BOARDS TO OTHER SIDE OF FORT...
Страница 103: ...FORT ASSEMBLY STEP 65 SCREW PFH 8x1 1 2 4 SCREW PFH 8x1 1 2 4 PLCS T4 T4 SEAT CLEAT W4L04543 1 x1 3 8 x6 1 2 24x34x164 2...
Страница 104: ...FORT ASSEMBLY STEP 66 SCREW PFH 8x1 1 2 8 SCREW PFH 8x1 1 2 8 PLCS M11 M11 SEAT W4L04542 5 8 x3 3 8 x12 16x86x304 2...
Страница 116: ...GLIDER ATTACHMENT SWING HANGER QUICK LINK 4 PLCS CHAIN GREEN 51 25 4 PLCS...