![Backyard Discovery SPRING COTTAGE PLAYHOUSE 1902312 Скачать руководство пользователя страница 73](http://html1.mh-extra.com/html/backyard-discovery/spring-cottage-playhouse-1902312/spring-cottage-playhouse-1902312_owners-manual-and-assembly-instructions_3445157073.webp)
REAR
LEFT
RIGHT
FRONT
N5
Phase 3
STEP 3
SCREW PWH BLK
8x1
(x4)
H100797
METAL CLEAT
(x1)
A4M00997
SCREW PFH SD
8x1 1/2
(x4)
H100538
SCREW PWH BLK
8x5/8
(x2)
H100202
90° L-BRACKET - BLK
(x1)
A4M00555
WALL CLEAT - W4L12659
5/8"x2 3/8"x7 1/16" (16x60x180)
N5
(x1)
202
(x2)
SCREW - 5/8"
(x1)
90° L-BRACKET - BLK
538
(x4)
SCREW - 1 1/2"
797
(x4)
SCREW - 1"
997
(x1)
METAL CLEAT
GABEL SUB-ASSEMBLY FROM
PHASE 3, STEP 2
N5
NOTE:
ALIGN PILOT HOLES IN N5 WALL
CLEAT AND METAL CLEAT WITH
PILOT HOLES IN H7 AND ATTACH AS
SHOWN.
H7
H7
N5
CLEAT
NOTE:
USING A 1/16 inch DRILL BIT AND CLEATS AS A TEMPLATE.
DRILL PILOT HOLES FOR TOP SCREWS.
DO NOT DRILL DEEPER THAN 3/4 inch.
73