background image

Single Beam 

Phase 4 

Step 1:  Gather assembly from phase 3 & hardware bag. 

Step 2: Slide top beam into clamp on fort and attach with 5/16"x6" carriage bolts as shown in fig. 1 below. 

Step 3: Adjust the single beam legs to make sure the top beam is level.  Legs may be taken 

in or out to adjust on uneven ground. 

Step 4: Once top beam is level, secure legs using (8) 5/16"x2 1/2" lag screws per single beam 

clamp as shown below. 

Step 5: Attach support brace  B to legs with (2) 4 1 /2" lag screws and (2) flat washers. 

Step 6:  Place double angle gussets G against beam and cross brace & attach with (4) 4 1/2" lag screws 

and 5/16" washers as shown in Fig G. 

NOTE:  Do not allow metal plate to extend 

- past the legs at minimum distance. 

Содержание Mountaineer

Страница 1: ...oints Keep parts out of the reach of children until assembled Parts of this product can present dangers if improperly assembled W CAUTION The plastic bags that contain the hardware may present a choki...

Страница 2: ......

Страница 3: ......

Страница 4: ......

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Страница 24: ......

Страница 25: ......

Страница 26: ...WS THROUGH SLIDE FLOOR SECURE WITH 2 5 16 FLAT WASHERS 2 LOCK NUTS 2016 TREEHOUSE SERIES CENTER SLIDE IN WALL OPENING POSITION BOTTOME LIP OF SLIDE FLUSH WITH EDGE OF THE FLOOR BOARD DRILL 2 3 16 PILO...

Страница 27: ......

Страница 28: ...Single Beam Option I INS EXPLSB 09...

Страница 29: ...Single Beam 2 POSITION TOP BEAM Parts Identification 3 POSITION TOP BEAM BEAM 4X6X133 STRIP 2 3 4 X110 TOP PLATE 3 POS 4 POSITION TOP BEAM BEAM 4X6X169 STRIP 2 3 4 X132 TOP PLATE 4 POS...

Страница 30: ......

Страница 31: ......

Страница 32: ......

Страница 33: ......

Страница 34: ...may be taken in or out to adjust on uneven ground Step 4 Once top beam is level secure legs using 8 5 16 x2 1 2 lag screws per single beam clamp as shown below Step 5 Attach support brace B to legs w...

Страница 35: ...into ground at an angle Attach with lag screws 1 1 2 Lag Screw REBAR STAKES rr NOTE Attach stakes to 4x6 single beam legs Stakes must be located as shown Stake Stake TOP VIEW Failure to use stakes can...

Отзывы: