STEP 2
ATTACH (6) ER CLIMBING ROCKS TO (6) M100 ROCK BOARDS USING 1-1/2" BOLTS, 3/8"
T-NUTS AND 1-1/8" WOOD SCREWS, AS SHOWN.
SCREW PFH
8x2
(32)
4 FT LADDER / ROCK LADDER ASSEMBLY
STEP 3
ATTACH (6) M100 ROCK BOARDS AND (2) M101 STEP BOARDS TO H75 & H84 RAILS USING
2" WOOD SCREWS, AS SHOWN.
M100
ER
ER
M100
H75
H84
M100
M100
M100
M100
M100
M100
M101
M101
3 1/4"
3 1/4"
3 1/4"
3 1/4"
3 1/4"
3 1/4"
3 1/4"
7/16"
THIS TOP ROCK BOARD MAY NEED TO
BE REMOVED IF USED WITH AN
ATTACHMENT BOARD WHEN
MOUNTING TO FORT.
USING RUNGS AS A TEMPLATE,
PILOT DRILL HOLES USING 1/8"
DRILL BIT.
H84 - OUTER UPRIGHT - W101358
1"x3 3/8"x50 3/4" (24x86x1290)
(1)
M100 - ROCK BOARD - W102777
5/8"x3 3/8"x18" (16x86x458)
(6)
M101 - STEP BOARD - W102778
5/8"x3 3/8"x18" (16x86x458)
(2)
ER - CLIMBING ROCK GREEN SMALL - A100060
(6)
SCREW PFH
8x1 1/8
(6)
T-NUT 3/8
(6)
BOLT FA
3/8x1 1/2
(6)