PRE-ASSEMBLY STEP 2 - TOOLS REQUIRED
Cordless Drill or
Electric Drill
Drill Attachments:
Phillips Head
Open End Wrenches 1/2" & 9/16"
Phillips Screw Driver
1/8", 3/16", 3/8" & 7/16"
Drill Bits
3/8" Drive Ratchet, 1/2" &
9/16" STD Sockets 1/2" & 9/16" Deep
Sockets
Claw Hammer
Rubber Mallet - Optional
Tape Measure
Square
Level 24"
26
Содержание EAGLES NEST FORT KNOTS
Страница 111: ...STEP 79 H25 H25 FLOOR SUPPORT W4L08699 1 x3 3 8 x20 3 4 24x86x528 1 SCREW PFH 8x2 BLK 2 SCREW PFH 8X2 BLK 2 PLCS 111...
Страница 137: ...NOTES 137...
Страница 138: ...NOTES 138...
Страница 139: ...NOTES 139...