10 FOOT SLIDE ASSEMBLY
PHASE 4
STEP 4
●
ONCE THE SLIDE BED, SUPPORT TUBES, AND SUPPORT BOARD ARE COMPLETELY IN THE CAVITY AND
SUPPORT POCKET, SECURE USING 3" SCREWS AT EACH OF THE PILOT HOLE LOCATIONS AS SHOWN.
●
REPEAT PROCESS FOR OPPOSITE SLIDE RAIL.
SCREW PFH
8x3
(38)
SCREW PFH 8x3
(19 PLCS)
SCREW PFH 8x3
(19 PLCS)
Содержание 6013
Страница 41: ...STEP 3 EC E74 E74 E79 E79 LAG SCREW WH 1 4x1 1 2 16 PLCS LAG SCREW WH 1 4x1 1 2 16 EC METAL RUNG 559 A100045 8...
Страница 43: ...STEP 5 LAG SCREW WH 1 4x1 4 PLCS FX FX E79 E79 FX HAND GRIP METAL GREEN 381 c c A100118 2 LAG SCREW WH 1 4x1 4...
Страница 85: ...q STEP 37 SCREW PWH 8x3 4 4 SCREW PWH 8x3 4 4 PLCS GK WINDOW FRAME 216x267 BYD GREEN A100146 1 GK 11 3 4 3 7 8...
Страница 91: ...STEP 43 SCREW PFH 8x1 1 2 36 R1 CLUB HOUSE ROOF BOARD W103520 3 4 x5 1 2 x59 18x140x1499 9 R1 E4...
Страница 98: ...STEP 50 TA METAL LADDER RAIL Y35 24 75G A100324 2 BOLT WH 5 16x1 1 2 4 TA BOLT WH 5 16x1 1 2 4 PLCS E2 E2...
Страница 107: ...STEP 60 SCREW TAPPING 14x2 1 2 1 SCREW TAPPING 14x2 1 2 1 PLC LN TELESCOPE A100104 1 LN F1...
Страница 113: ...STEP 66 EF ED DP EF FA DP DP SWING SEAT GREEN A100027 2 FA QUICK LINK A100069 4 EF CHAIN GREEN 57 A100047 4...