SP1 - FLOOR SUPPORT CLEAT - W100711
1"x1"x53 3/8" (24x24x1356)
(2)
J2 - END FLOOR CLEAT - W100710
1"x2 3/8"x3 3/8" (24x60x86)
(4)
F71 - STANDARD ANGLE BRACE - W100689
1 3/8"x2 3/8"x13" (36x60x330)
(2)
NUT BARREL
WH 5/16x7/8
(2)
LAG SCREW
WH 5/16x2 1/2
(2)
BOLT WH
5/16x1 1/2
(2)
SCREW PFH
8x1 1/2
(10)
WASHER
LOCK EXT
8x19
(4)
WASHER
LOCK EXT
12x19
(2)
STEP 7
FIRST ATTACH A F71 BRACE TO A M13 BOARD AND A F71 BRACE TO A K4
BOARD USING HARDWARE AS SHOWN THROUGH PRE DRILLED HOLE.
PRE DRILL AND ATTACH THE F71 BRACES TO E2 BOARDS.
ATTACH A SP1 BOARD TO M13 BOARD AND K4 BOARD RESTING ON F71
BRACES. USING HARDWARE AS SHOWN THROUGH PRE DRILLED HOLES.
ATTACH J2 BOARDS TO EACH E2 BOARD AND TO THE E1 AND E3 BOARDS. THE
TOP OF THE J2 BOARDS SHOULD BE FLUSH WITH THE TOP OF THE SP1
BOARDS. ATTACH THROUGH PRE DRILLED HOLES WITH HARDWARE SHOWN
.
NUT BARREL WH 5/16x7/8
(2 PLCS)
WASHER LOCK EXT 12x19
(2 PLCS)
FLUSH
SP1
J2
F71
K4
M13
E1
E3
E2
E2
45-11/16"
SCREW PFH 8x1 1/2
(10 PLCS)
VERIFY THAT FORT IS
STILL SQUARE, BEFORE
FASTENING F71 BOARDS
TO E2 BOARDS
SCREW PFH 8x2 1/4
(8 PLCS)
LAG SCREW WH 5/16x2 1/2
(2 PLCS)
WASHER LOCK EXT 8x19
(2 PLCS)
WASHER LOCK EXT 8x19
(2 PLCS)
BOLT WH 5/16x1 1/2
(2 PLCS)
SCREW PFH
8x2 1/4
(8)