SWING BEAM END
(x2)
A4M01294
ALIGN ALL HOLES AND ASSEMBLE USING
THE METAL BRACKETS AS SHOWN. THEN
PLACE THE ID TAG IN THE APPROXIMATE
LOCATION SHOWN BELOW.
ATTACH QUICK LINKS TO DUCTILE
HANGERS AND INSTALL BOLTS AS SHOWN.
NOTE:
STEP 2
NOTE:
294
(x2)
SWING TUBE, Y-SECTION
024
(x2)
METAL BRACKET GREEN
811
(x2)
BOLT - 2 3/4
819
(x4)
LOCK NUT - M12
242
(x4)
QUICK LINK (LONG) WZ
040
(x4)
DUCTILE HANGER WITH INSERT WZ
818
(x4)
BOLT - 50mm
375
(x1)
BYD TAG STICKER (SMALL)
022
(x1)
TOP BEAM CONNECTING TUBE
499
(x2)
NUT BARREL - 7/8
METAL BRACKET GREEN
(x2)
A4M01024
QUICK LINK (LONG) WZ
(x4)
H100242
LOCK NUT WZ
M12
(x4)
H100819
TOP BEAM CONNECTING TUBE
(x1)
A4M01022
BYD TAG STICKER (SMALL)
(x1)
A6P00375
NUT BARREL WH WZ
5/16x7/8
(x2)
H100499
BOLT HEX M12x50mm WZ
M12x 50mm
(x4)
H100818
BOLT CARRIAGE WZ
5/16x2 3/4
(x2)
H100811
DUCTILE HANGER WITH INSERT WZ
(x4)
A4M01040
17