STEP 4
ATTACH (2) J1 DECK BRACES TO M6 FLOOR RAIL USING (2)
1" BOLTS, LOCK WASHERS AND 7/8" BARREL NUTS.
ATTACH (2) J1 DECK BRACES TO H1 FLOOR RAIL USING (2)
1 1/2" BOLTS, LOCK WASHERS AND 7/8" BARREL NUTS.
USING J1 AS A TEMPLATE, PILOT DRILL USING 1/8" DRILL
BIT AND ATTACH J1 DECK BRACE TO E1, E2 & E3 TOWER
LEGS USING (4) 2" LAG SCREWS AND LOCK WASHERS, AS
SHOWN.
STEP 5
ATTACH L5 FLOOR BOARDS
TO H5 FLOOR SUPPORTS
USING (4) 2" SCREWS.
ATTACH (8) M3 FLOOR
BOARDS, AN N2 FLOOR
BOARD THEN (8) MORE M3
FLOOR BOARDS TO H1 & H2
FLOOR RAILS USING (66) 2"
SCREWS.
LAG SCREW
WH 1/4x2
(4)
WASHER
LOCK EXT
6x15
(4)
NUT BARREL
WH 5/16x7/8
(4)
WASHER
LOCK EXT
8x19
(4)
WASHER
LOCK EXT
12x19
(4)
BOLT WH
5/16x1
(2)
SCREW PFH
8x2
(70)
J1 - DECK BRACE - W100561
1"x2 3/8"x15 3/4" (24x60x400)
L5 - FLOOR BOARD - W100570
5/8"x4 3/8"x37 1/8" (16x112x942)
M3 - FLOOR BOARD - W100575
5/8"x3 3/8"x41 7/8" (16x86x1064)
N2 - FLOOR BOARD - W100589
5/8"x2 3/8"x41 7/8" (16x60x1064)
BOLT WH
5/16x1 1/2
(2)