DW - SLIDE SUPPORT TUBE 21.34x505 - A100034
21.34 OD x 2.77 W x 505
(4)
10 FOOT SLIDE ASSEMBLY
STEP 3
●
PLACE (1) SLIDE RAIL ASSEMBLY ON A FLAT SURFACE AND BEGIN INSERTING SLIDE BED AT THE BOTTOM OF THE SLIDE RAIL (FIG. 1). HAVE A
HELPER BEND THE SLIDE BED TOWARDS THE TOP OF THE SLIDE AND INSERT THE BED INTO THE SLIDE CAVITY. MAKE SURE SLIDE BED IS
COMPLETELY DOWN IN THE SLIDE CAVITY.
●
INSTALL THE (4) SLIDE SUPPORT TUBES INTO THEIR RESPECTIVE PILOT LOCATIONS (FIG. 2).
SLIDE BED 10' LIGHT GREEN
START HERE
DW - SLIDE SUPPORT TUBE 21.34x505
(4 PLCS)
(FIG. 1)
(FIG. 2)
Содержание 1601017
Страница 56: ...STEP 19 SCREW PWH 8x5 8 8 PLCS TARP 1 PLC SCREW PWH 8x5 8 8 TARP A6P00091 36 5 8 x132 930x3352 1...
Страница 60: ...STEP 23 SCREW PWH 8x5 8 2 SCREW PWH 8x5 8 2 PLCS A REVISION TAG 1 PLC SQ A REVISION TAG A100314 1...
Страница 62: ...STEP 25 KG TIC TAC TOE WITH SCREWS A100198 1 SCREW TAPPING 14x1 1 2 8 PLCS CENTER IN OPENING CENTER IN OPENING...
Страница 84: ...STEP 47 SCREW PFH 8x2 1 4 8 J2 TARP SUPPORT W4L06488 1 x2 3 8 x38 24x60x964 2 SCREW PFH 8x2 1 4 8 PLCS J2 J2...
Страница 86: ...STEP 49 SCREW PWH 8x5 8 8 SCREW PWH 8x5 8 8 PLCS TARP 1 PLC TARP A6P00110 36 5 8 x117 5 8 930x2986 1...
Страница 92: ...STEP 55 KNOT 3 PLCS ROPE LADDER 1 PLC ROPE LADDER A6P00112 1...
Страница 98: ...STEP 61 TIGHTEN SCREWS AND BOLTS AT THIS TIME TUNNEL 1 PLC TUNNEL A6P00065 1 8 x61 3 8 x64 7 8 2x1558x1649 1...
Страница 101: ...STEP 64 SCREW PFH 8x1 1 2 4 SCREW PFH 8x1 1 2 4 PLCS K16 K16 ARCHED RAIL W4L06521 5 8 x5 1 4 x26 1 8 16x134x662 1...
Страница 102: ...STEP 65 SCREW PFH 8x1 1 4 12 SCREW PFH 8x1 1 4 12 PLCS 3 7 8 1 3 16 3 1 8 3 1 8...