Bacharach 24-7224 Скачать руководство пользователя страница 5

Instruction 4-9415 

Bacharach, Inc. 

5

Flue Gas Sample Conditioning System

Maintenance

Probe

The probe’s sponge-type filter (Figure 3, Item 9) needs to be inspected at 

regular intervals for dirt contamination. Replace filter as necessary by 

first pulling out the Peltier cooler from the probe and then exchanging 

the filter with a new one.

Peltier Cooler

The cooler’s wadding filter (Figure 3, Item 12) needs to be inspected at 

regular intervals for dirt contamination. Replace filter as necessary by 

first pulling off the filter chamber’s top cap and then exchanging the 

filter with a new one.

Condensate Pump

WARNING!

 

 The condensed water will be warm and slightly 

acidic. Take all necessary precautions to prevent the water 

from splashing into your eyes or contacting your skin.

Empty the pump’s reservoir (Figure 3, Item 15) by first holding the 

pump with its reservoir facing downwards. Then twist the reservoir 90 

degrees (either clockwise or counterclockwise) to free it from the pump 

base. Empty the reservoir; then reattach it to the pump. Before reat-

taching the reservoir, however, make sure that the reservoir’s o-ring 

(Figure 3, Item 20) is properly positioned inside its grove in the pump 

base.

The pump’s wadding filter (Figure 3, Item 17) needs to be inspected at 

regular intervals for dirt contamination. Replace filter as necessary by 

first unscrewing the filter chamber cap and then exchanging the filter 

with a new one.

Содержание 24-7224

Страница 1: ...and SO2 Water vapor is removed from the flue gas sample by passing the sample through a Peltier Cooler where the sample is chilled which in turn causes the water vapor contained in the gas sample to be removed from the sample The water that was extracted from the gas sample is then pumped out of the Peltier Cooler and into a water trap The now dry conditioned flue gas sample is then sent to its as...

Страница 2: ...d then inserting the cooler s inlet connector ensuring first that a filter is present between the cooler and probe Attach the pump s inlet hose to the bottom of the Peltier cooler Water that is condensed from the flue gas sample will be pumped into the con densate pump s reservoir through this hose Note that the condensate pump can be placed in an upright horizontal or hanging position A magnet mo...

Страница 3: ...ach Inc Flue Gas Sample Conditioning System Figure 2 Equipment Setup PELTIER COOLER PROBE ASSEMBLY PUMP POWER SUPPLY 100 240 VAC 50 60 HZ Connect to Combustion Test Equipment STACK TEMP THERMOCOUPLE PRESSURE Blue FLUE GAS Yellow ...

Страница 4: ...yzer as described in its in struction manual Then insert the probe into the flue stack and begin testing During the combustion test the condensed water vapor from the flue gas will accumulate inside the pump s reservoir If the water level be gins to approach the ends of the tubes inside the reservoir then stop the test and empty the reservoir as described in the Maintenance Section of this manual ...

Страница 5: ...NING The condensed water will be warm and slightly acidic Take all necessary precautions to prevent the water from splashing into your eyes or contacting your skin Empty the pump s reservoir Figure 3 Item 15 by first holding the pump with its reservoir facing downwards Then twist the reservoir 90 degrees either clockwise or counterclockwise to free it from the pump base Empty the reservoir then re...

Страница 6: ... 0875 7 Screw M4 x 6mm 501 3829 8 Retaining Nut 102 3740 9 Filter Qty 5 07 1646 Peltier Cooler Power Supply 10 Complete Assembly Peltier Cooler Power Supply AC Power Cord not included 24 1179 11 Plastic End Cap 106 5454 12 Filter Wadding 07 1647 13 Power Supply 304 1713 14 AC Power Supply Cord 3 Wire 4998 8986 Condensate Pump 15 Complete Assembly 24 1180 16 Reservoir 106 5453 17 Plastic Screw On C...

Страница 7: ...Instruction 24 9415 Bacharach Inc Flue Gas Sample Conditioning System Figure 3 Replacement Parts 11 20 20 12 Part of Item 10 1 21 9 6 7 8 5 2 Part of Item 10 13 14 18 23 17 22 16 20 19 15 ...

Страница 8: ...rach of Canada Inc 250 Shields Court Unit 3 Markham Ontario L3R 9W7 Canada Phone 905 470 8985 Fax 905 470 8963 Email bachcan idirect com México Bacharach de México Playa Regatas No 473 Tercer Piso Col Militar Marte Delegación Iztacalco 08830 México D F México Phones 52 555 634 7740 52 555 634 7741 Fax 52 555 634 7738 Email bacharachservicio bacharach com mx Europe European Headquarters Bacharach I...

Страница 9: ...Instruction 24 9415 Bacharach Inc Flue Gas Sample Conditioning System ...

Страница 10: ...alley Circle New Kensington PA 15068 Ph 724 334 5000 Fax 724 334 5001 Toll Free 800 736 4666 Website www bacharach inc com E mail help bacharach inc com Printed in U S A Registered Trademark Copyright Bacharach Inc 2000 2005 ...

Отзывы: