RIGGING AND
INSTALLATION
1
RI_VL_SA 01/11-01
VTL
Cooling Towers
VFL
Closed Circuit Cooling Towers
VCL
Evaporative Condensers
The BAC equipment should be rigged and installed as
outlined in this bulletin.
These procedures should be thoroughly reviewed prior to
the rigging and operation to acquaint all personnel with
the procedures to be followed and to assure that all
necessary equipment will be available at the jobsite.
Be sure to have a copy of the unit certified drawing
available for reference. If you do not have a copy of this
drawing or if you need additional information about this
unit, contact the local BAC representative. The model
number and serial number of the unit are located on a
label on the sinde of the unit.
Table of Contents
Page
General Information
Rigging
Optional Accessories Assembly
Inspection Prior to Start-up
Recommended Maintenance and
Monitoring Programme