22
W W W . B A L T I M O R E A I R C O I L . C O M . A U
M A R 1 0 8 - 2
Bleed Line Calculations
Bleed rate is determined by the following formula;
Bleed Rate = B = E/(n-1)
Where:
B
= Bleed Rate (L/S)
E
* = Evaporation Rate (L/S)
Q
= Process Fluid Flow Rate (L/S)
R
= Range = Entering – Leaving Fluid Temperature (°C)
n
= Number of Cycles of Concentration = CR/CM
CR
= Concentration in Re-circulating Water
CM
= Concentration in Make-Up Water
*The evaporation rate (E) can be determined by any one of the following methods: 1. The
evaporation rate is approximately 1.5 L/hr for each kW of operating Total Heat Rejection
(THR). 2. The evaporation rate (L/hr) is = 6.3 x R (°C) x water flow.
The following example illustrates a bleed rate calculation:
Closed Circuit Cooling Tower Process Fluid Flow Rate = 50 L/S
Range = 5.5°C
Maximum Allowable Chloride Concentration = 250 ppm
Concentration of Chlorides in Make-Up Water = 45 ppm
Solution:
E = 6.3 x R x flow = 6.3 x 5.5 x 50 = 1732.5 L/hr
n = CR/CM = 250/45 ppm = 5.55
Bleed Rate
= B = E/(n-1) = 1732.5/(5.55-1) = 381 L/hr
Therefore in this case we must bleed 0.159 L/S to limit the
concentration of impurities. This example focuses on a single
parameter (chloride concentration) of water only. The bleed rate
required for a system (when evaluating more than one parameter)
is the highest bleed rate required to keep all parameters within
recommended limits.
Содержание PCT Series
Страница 1: ...OPERATION MAINTENANCE MANUAL PCT Cooling Towers ...
Страница 2: ......
Страница 8: ...PCT COOLING TOWER Operation and Maintenance INITIAL AND SEASONAL START UP EXTENDED SHUTDOWN 1 ...
Страница 26: ...PCT COOLING TOWER Water Treatment BLEED RATE BLEED LINE CALCULATIONS 3 ...
Страница 29: ...23 W W W B A L T I M O R E A I R C O I L C O M A U M A R 1 0 8 2 Water Treatment Bleed Line Calculations ...
Страница 30: ...PCT COOLING TOWER Corrosion and Scale Control CORROSION AND TREATMENTS CORROSION AND SCALE CONTROL 4 ...
Страница 36: ...PCT COOLING TOWER Factory Authorised Parts THE PERFECT FIT 5 ...