WWW.BALTIMOREAIRCOIL.COM
17
External Service Platform Installation (Optional)
Refer to
Figures 25 through 27 on pages 17 through 19 for your unit platform assembly.
1. Lift hang-on module(s) into place by placing hanger into notch at the top of the unit,
and secure to unit using 3/8” x 1 1/4” bolts. See
Detail A (Figures 25 through 27).
2. Slide clamps behind panel flange at bottom of hang-on module(s) supports, and secure
to platform.
See Detail B (Figures 25 through 27).
3. If applicable, lift drop-in platform section(s) between mounted hang-on modules, and
lower into position so that it rests on support channels. Bolt platform and railings into
place using 3/8” x 1 1/4” bolts.
See Detail C (Figures 26 and 27).
Detail A
Detail B
Figure 25.
External Service Platform Assembly
for 8’ x 6’ and 8’ x 9’ Units
Optional Accessories
Intake Sound Attenuation
Assembly (FXV Only)
External Service Platform
Installation
NOTES:
1.
Platform can be installed prior
to rigging coil section for easier
installation.
2.
Platforms, ladders and safety
cages can be added at the time
of order or as an aftermarket
item.
3.
Safety gates are provided for all
handrail openings as standard.
All components are designed to
meet OSHA requirements.
Unit
3/8 x 1 1/4” Bolt
3/8” Flatwasher
Hang-on Module
Hang-On Module
3/8” Rivnuts
Flange