7
3.
ATTACH MOUNTING BRACKET TO RAIL
i. Insert 4 x
item C2
into
item E1
(2 in the top channel, 2 in the bottom channel).
ii. Fix
item C1
centrally to
item E1
using
item C3
.
i. Insert 4 x
item D1
into
item B1
(2 in each channel).
ii. Attach
item C1
to
item B1
using
item D2
. Leave a 6mm gap at top of the column.
4.
FIX RAIL TO COLUMN
E1
C1
C2
C3
6mm
(Excluding
end cap)
C1
B1
E1
D1
D2