8 Maintenance
Operating Instructions BA ULTIMATE POWER + / BA ULTIMATE
52
64 01 553 D3551
.
201.03.03
.
02
Process
✔ The expiry date of the chuck tester (A) has not elapsed.
1. Insert the chuck tester into the FG clamping system [ → 28].
2. Tighten the chuck tester until the marking ring appears (withdrawal
force: 22 N)
Does the chuck tester slide out of the chuck before the marking ring
appears?
CAUTION! The chuck is defective and the secure fit of the burr
instrument is not guaranteed. This may cause injury!
Workshop _ BA
1. Do not use the product.
2. Have the clamping system replaced by a workshop authorized by
B.A. International.
Tip: Record the time and result of the check for your own information.
6401553.book Seite 52 Montag, 13. Juni 2016 4:27 16